THE LAST 10 YEARS EXPERIENCES
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Provision of Consultant Services for The Enhancement of Wharf Infrastructure at NPCT1, Jakarta | PT New Priok Container Terminal One (NPCT1) | Main | 2024 |
|
Preliminary Calculations to Determine Optimum Size of Piles, Structural Concrete Elements, and Fenders based on Freeport's Conceptual Design for Jetty in Mimika, Papua | PT Swi Jetty Nusantara | Main | 2024 |
|
Lerokis Jetty Improvement
|
PT Batutua Tembaga Raya | Main | 2024 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia | Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO | 2020-2023 |
Phase 1 : Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)Phase 2 : Prepare SPAR, and Safeguard DocumentsPhase 3 : Detail Surveys, Preparation of Bidding DocumentsPhase 4: Procurement SupportPhase 5: Project Management and Construction Supervision |
Review and Technical Evaluations of Tender for Wharf Construction 4.3 -4.4 PT KBS | PT Krakatau Bandar Samudera | Main | 2023 |
|
Supervision of Cable Trench Strengthening on the North Side of Pier 1A of Kalibaru Terminal | PT Pelindo Solusi Logistik | Main | 2023 |
|
Feasibility Study for Morowali Project | PT Dover Chemical | Main | 2023 |
|
Topography Survey, Hydrographic / Bathymetric Survey, Soil Investigation for Jetty in Central Kalimantan | PT Bahtera Semesta Indonesia Raya | Main | 2023 |
|
Study of Land Cooperation Value, Basic Infrastructure, and Service Charge in Kijing Terminal Supporting Area | PT Pelindo Solusi Logistik | Main | 2023 |
|
Jasa Desain Pra-tender Jetty Adaro Logistics di Kelanis | PT SWI Jetty Nusantara | Main | 2023 | Jasa Desain Pra-tender Jetty Adaro Logistics |
Basic Design & Cost Estimation Jetty 100.000 DWT di Morowali | PT Dover Chemical | Main | 2023 | Basic Design & Cost Estimation Jetty 100.000 DWT |
Jasa Konsultansi Pembuatan Basic Design Terminal Curah Cair di Branch Belawan dan Dumai | PT Pelindo Multi Terminal | Main | 2023 | Jasa Konsultansi Pembuatan Basic Design Terminal Curah Cair |
Survey, Soil Investigation, Detailed Engineering Design Jetty LCT di Bumbulan, Gorontalo | PT Mentari Alam Persada | Main | 2023 | Survey, Soil Investigation, Detailed Engineering Design Jetty LCT |
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia | Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO | 2020-2023 |
|
Design and Construction Supervision of Container Yard at South 107, 219-223X, and Ex Tjetot in Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2020-2022 |
|
Review Design Consult Seaport Jetty&Trestle - OKI Seaport | PT OKI Pulp & Paper Mills | Main | 2022-2023 |
|
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction(EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia | Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa, and PT Cita Prisma - JO | 2020-2023 |
|
Rehabilitation Design of Container Yard and Drainage System in PT Jakarta International Container Terminal Due To West Jetty Construction and Sea Water Level Adjustment | PT Jakarta International Container Terminal | Main | 2022-2023 |
|
Detailed Engineering Design and Supervision of Special Terminal Teluk Timbau in Central Kalimantan | PT Mega Multi Energi | Main | 2022-2023 |
|
Consultancy Service for Design the Major Repairment and Modification of Conveyor Belt Unit including Accessories owned by PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu | PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu | Main | 2022-2023 |
|
Topographic Survey and Benchmarking to Pelindo’s Reference in Block Double Area of PT JICT Terminal | PT Jakarta International Termnal | Main | 2022 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia | Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO | 2020-2023 |
|
Independent Engineer Consultancy Services Work on The Construction of a 57-meter Container Yard in North Kalibaru Terminal, Tanjung Priok Port | PT New Priok Container Terminal One and PT Pengembang Pelabuhan Indonesia | Main | 2021 -2022 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia | Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO | 2020-2023 |
|
Design and Construction Supervision of 107 Selatan, 219-223X, and Eks. Tjetot Container Yard in TanjungPriok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2020-2022 |
|
Survey, Investigation and Design Jetty PT Sinarjaya Inti Mulya on Jl. Soekarno Hatta, Srengsem, Bandar Lampung | PT Sinajaya Inti Mulya | Main | 2020 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Soil Investigation of Floating Mosque Ancol | PT Taman Impian Jaya Ancol | Main | 2019 |
|
Lameruru Port Master Plan Study | Ministry of Transport | Main | 2019 |
|
Soil Investigation North Side Lot A and B Ancol | KSO Jaya Ancol – Crown Group | Main | 2019 |
|
Cost Estimation on Saumlaki Terminal Getaway Asia | Arena Syscom | Main | 2019 |
|
Revitalization Plan for Multipurpose Area Sindulang, West Side Inggom Jetty Plan and Jetty & Ex. Walie Jaya Yard Retrofitting in Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2019 |
|
Consultancy and Design of Jetty Construction in Talisayan, Berau, East Kalimantan | PT Dwiwira Lestari Jaya | Main | 2019 |
|
Conceptual Study of Anthracite Loading Terminal in Chimbote, Peru | Archean Andean Anthracite S, A | Main | 2019 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Construction Supervision of Dredging at AKR West Nilam, Tanjung Perak, Surabaya | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Jetty Design Validation on PT OKI Pulp & Paper Mills, Palembang | PT OKI Pulp & Paper Mills | Main | 2018 |
|
Survey, Investigation and Design Jetty, Bulukumba, South Sulawesi | PT Mitra Dagang Makmur | Main | 2018 |
|
Improvement & Rehabilitation Design Container Yard Ex. Pacific Paint Phase II and Ex. Perca Warehouse at Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 |
|
Jetty Consultancy Service, Lubuk Gaung, Dumai | Main | 2018 | ||
PT Sari Dumai Sejati /GLOBAL MARINE AND PORT SERVICES PTE LTD | Main | 2018 |
|
|
Bathymetry Survey, West Nilam | PT Terminal Nilam Utara | Main | 2018 |
|
Survey, Assessment and Review Design Jetty, West Nilam, Tanjung Perak, Surabaya | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Survey, Investigation and Design Jetty AKR, Banyuasin, South Sumatra | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Topographic Survey, Buntok | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Supervision of Construction Work on Container Yard 115 and Ex Warehouse 114 Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 |
|
Measurement of Parking Area Situations on Dufan Plaza, East Coast, And Carnival | PT Taman Impian Jaya Ancol | Main | 2018 |
|
Rehabilitation Design and Elevation Disposition of Container Yard 216X – 218X, Port of Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 |
|
Survey and Design Jetty AKR Buntok, Muara Teweh - Central Kalimantan | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Soil Investigation Buntok, Muara Teweh, Central Kalimantan | PT AKR CORPORINDO, Tbk | Main | 2018 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Construction Supervision of Jetty (100 x 25 M2) at Gorontalo Port | PT Pelabuhan Indonesia IV (Makassar) | Main | 2017 |
|
Assessment & Review Jetty Exsisting in PT Bhakti Mingasutama, Eretan, Indramayu, West Java | PT Bhakti Mingasutama | Main | 2017 |
|
Container Yard Alternative Design for Pontianak New Port | PT Geotechnical Environmental | Main | 2017 |
|
Assessment of Factory Building, Tangerang-Banten | PT Kiantaka Rasa | Main | 2017 |
|
Assessment of AKR Tower Building (Second Stage), Kebon Jeruk - West Jakarta | PT AKR CORPORINDO, Tbk | Main | 2017 |
|
Detailed Engineering Design of Jetty and Trestle, Bontang, East Kalimantan | PT EnergiUnggulPersada | Main | 2017 |
|
Assessment of AKR Tower Building, Kebon Jeruk, West Jakarta | PT AKR Corporindo, Tbk | Main | 2017 |
|
Topographic Survey of Bidadari Island | PT Pembangunan Jaya Ancol, Tbk | Main | 2017 |
|
Survey and Soil Investigation of Industrial Estate Project, Bontang, East Kalimantan | PT Sumatra Bulker | Main | 2017 |
|
Structural Checking of Floating Restaurant Muara Angke, North Jakarta/td> | PT Bobby & Team | Main | 2017 |
|
Review Design Precast System | PT Budi Perkasa Alam | Main | 2017 |
|
Floating Restaurant Muara Angke, North Jakarta - Structure Accredited Checker Consultant | PT KeplandInvestama | Main | 2017 |
|
Main | 2017 | |||
Conceptual Layout and DED Jetty Pontianak New Port | PT Geotechnical Environmental service Indonesia | Main | 2017 |
|
Assessment Jetty Existing, Bitung - Sulawesi Utara | PT AKR Corporindo, Tbk | Main | 2017 |
|
Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway | ADB | But Cardno Emerging Markets (Australia) PTY. LTD. | 2017 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Detailed Engineering Design of Jetty and Trestle in SeiSembilang, South Sumatra | PT SumberHijauPermai | Main | 2016 |
|
DLKr DLKp Study for Depapre Port, Papua | Main | 2016 |
|
|
Detailed Engineering and Design (DED), Donggala Port, Central Sulawesi | Ministry of Transport (KementerianPerhubungan) | Main | 2016 |
|
Review Design of Existing Jetty in Bitung Terminal, North Sulawesi | PT.AKR Corporindo.Tbk | Main | 2016 |
|
SiteSelection and Location Determination for Ports in Indramayu Regency, West Java | PT.Suryacipta Swadaya | Main | 2016 |
|
Supervision of Basin Dredging in Jetty 3, Cilegon, West Java | PT Krakatau Bandar Samudera | Main | 2016 |
|
Project, Location | Owner/Source of fund | Main/Associate | Year | Job Description |
---|---|---|---|---|
Detailed Engineering Design and Planning Layout for Reclamation & Gabion Wall Kendari New Port Container Terminal, South-East Sulawesi | Pelindo IV | Main | 2015 |
|
Construction Management of Jetty 7.3 and 4.5 ‐ 4.6 in CIlegon, West Java | PT Krakatau Bandar Samudera | PT Krakatau Konsultan | 2015 |
|
Feasibility Coal Traffic in Tanjung Api‐Api, South Sumatera | PT Indorama Synthetics, Tbk | Main | 2015 |
|
Main | 2015 | |||
Topographic & Geotechnical Survey, Bojonegoro | PT Elnusa, Tbk | Main | 2015 |
|
Main | 2015 | |||
Master Plan of Muntok Port, Bangka Belitung Province | Tanjung Priok port of authority | Main | 2015 |
|
Main | 2015 | |||
Sub Bottom Profilling Dermaga LNG at Cilegon | PT Energi Dian Kemala | Main | 2015 |
|
Preparation of study DLKR DLKP port of Sunda Kelapa | Tanjung Priok port of authority | Main | 2015 |
|
Bathymetry survey, Soil Investigation, Detailed Engineering Design, Tender Evaluation, and Supervision of Construction Port at PT CS2 Pola Sehat, Banyuasin, South Sumatra, Indonesia | PT CS2 PolaSehat | Main | 2015 |
|
Detailed Engineering Design Of Bengkulu Coal Port Berthing Facility | PT. Aurecon Indonesia | Main | 2015 |
|
Conceptual of Jetty Layout in Senegal | PT Synco Global | Main | 2015 |
|
Bathymetry survey, Tidal, and currents for Terminal Tarumanagara, Bekasi | PT. Mega Agung Nusantara | Main | 2015 |
|
Impact Study Ling Way for PT Pelabuhan Tegar Indonesia | PT PelabuhanTegar Indonesia | Main | 2015 |
|
PROJECT ARTICLES
Terminal curah kering & Petikemas Tanjung Proik
PT. Diagram Triproporsi sebagai Konsultan yang melaksanakan Survei Investigasi Desain (SID)...
Belawan Port, Medan, North Sumatera
PT DIAGRAM TRIPROPORSI - Jakarta bekerja sama dengan PT. VINI NUSANTARA CONSULTANT – Medan untuk...
Depapre port Project, Jayapura, Papua
Kondisi kualitas pelayanan Pelabuhan Jayapura di Kota Jayapura saat ini terindikasi sudah...
Palaran Port, Samarinda, East Kalimantan
Kota Samarinda sebagai ibukota Propinsi Kalimantan Timur merupakan wilayah daratan yang dibelah...
RIP Khusus minyak dan gas bumi Pertamina Balongan
Ringkasan Eksekutif Master Plan Pelabuhan Balongan ini adalah Laporan ke lima yang disusun oleh...
Rencana Induk Pelabuhan Dumai
Ringkasan Eksekutif Master Plan Pelabuhan Dumai ini adalah panduan untuk pengembangan pelabuhan...
Kariangau Port, Balikpapan, East Kalimantan
PT. DIAGRAM TRIPROPORSI selaku Konsultan Supervisi dan desain untuk pelaksanaan Proyek Pembangunan...
Adani Tanjung Carat Project
PT ADANI GLOBAL berencana untuk membangun pelabuhan khusus yang akan melayani pengangkutan...