Project, Location Owner/Source of fund Main/Associate Year Job Description
Jasa Konsultan Pekerjaan Review dan Re-Design Jetty Buton, Siak, Riau PT Oriental Resources Indonesia Main 2025
  1. Review hasil soil investigation, survei batimetri, dan survei topografi oleh konsultan terdahulu
  2. Review hasil design perencanaan oleh konsultan perencana agar dapat diaplikasikan dengan aman ke dalam kondisi di lapangan.
  3. Review gambar rencana yang dibuat konsultan perencana secara mendetail hingga skala, dimensi, dan keterangan
  4. Memberikan justifikasi teknis bila diperlukan perubahan dalam penyempurnaan design yang sudah ada
  5. Memberikan rekomendasi teknis dalam bidang design, spesifikasi, dan biaya
  6. Memberikan masukan mengenai jetty dan desain rencana pembesaran kapasitas jetty
  7. Cost estimation
  8. Reporting
Jasa Konsultan Pekerjaan Soil Investigation Jetty Button, Siak, Riau PT Oriental Resources Indonesia Main 2025
  1. Penyelidikan tanah
  2. Pengambilan sampel tanah
  3. Pengujian laboratorium
  4. Penyusunan laporan
Project, Location Owner/Source of fund Main/Associate Year Job Description
Bathymetric Survey Of Upstream Tributary of Mahakam River (Leg 1 : Kelinjau River, Leg 2: Kedang Kapala River) in East Kalimantan Province PT Bara Energi Makmur Main 2025
  1. Position and Elevation Survey
  2. River Bathymetry Survey
  3. River Current Measurement
  4. Water Level Elevation Measurement
  5. Elevation of Three Bridges
  6. Brief reporting of the following matters : Brage size that can safely transit the river base on bathymetry findings, Indication of transshipment location alongside the bank of the river, Indication of stocpile road at the river bank which can be seen during the survey
Design Consultant Of Mobile Equipment Charging Station PT Jakarta International Container Terminal PT Jakarta International Container Termina Main 2025
  1. Detailed Engineering Design
  2. Tender document
  3. Supervision
Detail Engineering Design for Civil Structure Work Additional Rewinder Block 12; Roll Handling System Block 11,12 & 13 PT OKI Pulp & Paper Mills Main 2025
  1. Site Visit and Data Gathering
  2. Detailed Engineering Design
  3. Detailed Engineering Design phase will analyze the following facilities:
  4. Civil Detail Design {DED}for Add RW 12 - Change Orientation frorn Left Side to the Right Side
  5. Civil Detail Design (DEDlfor New Roll Handling System for Block 11, 12 & 13
Preliminary design for AKR fuel terminal in Morowali PT Swi Jetty Nusantara Main 2025
  1. Data collection
  2. Prelimenery design
Marina Jetty Design Project in Mawatu, Labuan Bajo, NTT PT Graha Properti Santosa Main 2025
  1. Data collection
  2. Detailed Engineering Design
  3. Engineering Drawing
  4. Bill of Quantity & Cost Estimation
  5. Technical Specification
  6. Tender document
Technical Study Consultant, Kendari Southeast Sulawesi PT Kacci Purnama Indah Main 2025
  1. Data Collection
  2. Verify the coordinate positions of the jetty.
  3. Inspect the condition of the coastline/shoreline.
  4. Determine the location for benchmark (BM) installation.
  5. Verify position and sea depth using a boat.
  6. Provide recommendations regarding the existing jetty and the proposed layout for the jetty capacity expansion.
Review and Update for Environmental Management & Monitoring Efforts (UKL-UPL) and Offshore Construction Service Permit PT Mentari Alam Persada Main 2025
  1. Review and Update for Environmental Management & Monitoring Efforts Documents (UKL-UPL)
  2. Review and Update for Offshore Construction Service Permit
Review Design Consult Seaport Jetty & Trestle - OKI Seaport PT OKI Pulp & Paper Mills Main 2024-2025
  1. Review Design for new trestle 420 m long, temporary trestle, expansion existing jetty, expansion to the new trestle
  2. Review and confirm, the detailed design prepared & technical spesification by EPC Contractor
  3. Attend weekly meeting
  4. Monthly report
  5. Tender document & evaluation standard
  6. Contractor selection (review on tenderers technical compliance)
  7. Project Supervision
Project, Location Owner/Source of fund Main/Associate Year Job Description
Provision of Consultant Services for The Enhancement of Wharf Infrastructure at NPCT1, Jakarta PT New Priok Container Terminal One (NPCT1) Main 2024
  • Detailed Engineering Design for mooring dolphin with access bridge
  • DED & Technical working method for fender
  • Bill of Quantity & Cost Estimation
  • Technical Specification
  • Tender document & evaluation standard
  • Contractor selection (review on tenderers technical compliance)
  • Project Supervision
Preliminary Calculations to Determine Optimum Size of Piles, Structural Concrete Elements, and Fenders based on Freeport's Conceptual Design for Jetty in Mimika, Papua PT Swi Jetty Nusantara Main 2024
  • Basic Design Jetty
  • Calculate the optimum size of piles, structural concrete elements, and fenders
  • Bill of Quantity (volume calclulation)
Lerokis Jetty Improvement
  • Soil Investigation
PT Batutua Tembaga Raya Main 2024
  • Supervision
  • Soil Investigation 2 points offshore & 3 points onshore
  • Laboratory test
  • Soil & Foundation Report
Topographic, Hydrographic, Flood Defence Survey, and Soil Investigation for ISP I2B Jetty in Mengkatip, Central Kalimantan. PT Bahtera Semesta Indonesia Jaya Main 2024
  • Topographic
  • Hydrographic
  • Flood Defence Survey
  • Soil Investigation
Project, Location Owner/Source of fund Main/Associate Year Job Description
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO 2020-2023

Phase 1 :

Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)

Phase 2 :

Prepare SPAR, and Safeguard Documents

Phase 3 :

Detail Surveys, Preparation of Bidding Documents

Phase 4:

Procurement Support

Phase 5:

Project Management and Construction Supervision
Review and Technical Evaluations of Tender for Wharf Construction 4.3 -4.4 PT KBS PT Krakatau Bandar Samudera Main 2023
    • Site Visit
    • Soil Investigation
    • Bathymetry Survey Pre-Dredging
    • Review Design
    • Cost Estimation & Bill of Quantity
    • Tender Assistance
    • Tender Document
Supervision of Cable Trench Strengthening on the North Side of Pier 1A of Kalibaru Terminal PT Pelindo Solusi Logistik Main 2023
    • Supervision
Feasibility Study for Morowali Project PT Dover Chemical Main 2023
  • Site Visit
  • Bathimetric Survey 100 Ha
  • Current Survey
  • Tidal Survey
  • Feasibility Study
Topography Survey, Hydrographic / Bathymetric Survey, Soil Investigation for Jetty in Central Kalimantan PT Bahtera Semesta Indonesia Raya Main 2023
  • Topography
  • Flood Defence
  • Hydrography/Bathymetry
  • Soil Investigation
Study of Land Cooperation Value, Basic Infrastructure, and Service Charge in Kijing Terminal Supporting Area PT Pelindo Solusi Logistik Main 2023
  • Value engineering
  • Financial analysis
  • Recommendation for minimum land use rates and service charge fee.
Jasa Desain Pra-tender Jetty Adaro Logistics di Kelanis PT SWI Jetty Nusantara Main 2023 Jasa Desain Pra-tender Jetty Adaro Logistics
Basic Design & Cost Estimation Jetty 100.000 DWT di Morowali PT Dover Chemical Main 2023 Basic Design & Cost Estimation Jetty 100.000 DWT
Jasa Konsultansi Pembuatan Basic Design Terminal Curah Cair di Branch Belawan dan Dumai PT Pelindo Multi Terminal Main 2023 Jasa Konsultansi Pembuatan Basic Design Terminal Curah Cair
Survey, Soil Investigation, Detailed Engineering Design Jetty LCT di Bumbulan, Gorontalo PT Mentari Alam Persada Main 2023 Survey, Soil Investigation, Detailed Engineering Design Jetty LCT
Review Design Consult Seaport Jetty&Trestle - OKI Seaport PT OKI Pulp & Paper Mills Main 2022-2023
    • Site Visit
    • Review Design
    • Contractor's Design Validation for Jetty & Trestle
Rehabilitation Design of Container Yard and Drainage System in PT Jakarta International Container Terminal Due To West Jetty Construction and Sea Water Level Adjustment PT Jakarta International Container Terminal Main 2022-2023
  • Site Visit
  • Topographic Survey : 37 Ha
  • Container Yard Layout
  • Geotechnical Analysis
  • Design of Rigid Pavement on Container Yard
  • Design of Drainage System
  • Bill of Quantity & Cost Estimation
  • Technical Specification
  • Tender Document
Detailed Engineering Design and Supervision of Special Terminal Teluk Timbau in Central Kalimantan PT Mega Multi Energi Main 2022-2023
  • Detailed Engineering Design Structure Jetty
  • Detailed Engineering Design Conveyor and Material Handling Equipment
  • BoQ and Cost Estimation
  • Technical Specification
  • Tender Assistance
  • Supervision
Consultancy Service for Design the Major Repairment and Modification of Conveyor Belt Unit including Accessories owned by PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu Main 2022-2023
  • Site Visit
  • Survey & data collection
  • Review and analysis bearing capacity
  • Dry Bulk Terminal Operational Study
  • Detailed Engineering Design of Conveyor Belt Repairment
  • Detailed Engineering Design of Modification Feeder and Loading System on Conveyor Belt A & C.
  • Engineering Drawing
  • Cost Estimation
  • Technical Specification
  • Tender Assistance
Project, Location Owner/Source of fund Main/Associate Year Job Description
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO 2020-2023
  • Phase 1 :

    Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)
  • Phase 2 :

    Prepare SPAR, and Safeguard Documents
  • Phase 3 :

    Detail Surveys, Preparation of Bidding Documents
  • Phase 4:

    Procurement Support
  • Phase 5:

    Project Management and Construction Supervision
Independent Engineer Consultancy Services Work on The Construction of a 57-meter Container Yard in North Kalibaru Terminal, Tanjung Priok Port PT New Priok Container Terminal One and PT Pengembang Pelabuhan Indonesia Main 2021 -2022
    • To Study and understand the detailed design and technical specifications and drawings along with supporting data to understand the project

    • To review the construction methodology, quality, assurance, and quality control procedure and report on findings

    • To review and check quality Assurance / Quality Control records

  • To review construction drawings and project specification
Design and Construction Supervision of 107 Selatan, 219-223X, and Eks. Tjetot Container Yard in TanjungPriok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2020-2022
  • Topographic Survey
  • Soil Investigation - Soil bearing capacity analysis and Settlement
  • Detailed Engineering Design
  • Cost Estimation - Technical Specification
  • Tender Document
  • Tender Assistant
  • Supervision
Project, Location Owner/Source of fund Main/Associate Year Job Description
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO 2020-2023
  • Phase 1 :

    Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)
  • Phase 2 :

    Prepare SPAR, and Safeguard Documents
  • Phase 3 :

    Detail Surveys, Preparation of Bidding Documents
  • Phase 4:

    Procurement Support
  • Phase 5:

    Project Management and Construction Supervision
Design and Construction Supervision of 107 Selatan, 219-223X, and Eks. Tjetot Container Yard in TanjungPriok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2020-2022
  • Topographic Survey
  • Soil Investigation - Soil bearing capacity analysis and Settlement
  • Detailed Engineering Design
  • Cost Estimation - Technical Specification
  • Tender Document
  • Tender Assistant
  • Supervision
Survey, Investigation and Design Jetty PT Sinarjaya Inti Mulya on Jl. Soekarno Hatta, Srengsem, Bandar Lampung PT Sinajaya Inti Mulya Main 2020
  • Site Visit - Soil Investigation
  • Hydro-oceanic Survey
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Project, Location Owner/Source of fund Main/Associate Year Job Description
Design and Construction Supervision of Container Yard at South 107, 219-223X, and Ex Tjetot in Tanjung Priok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2020-2022
    • Topographic Survey
    • Soil Investigation
    • Soil bearing capacity analysis and Settelment
    • Detailed Engineering Design
    • Cost Estimation
    • Technical Specification
    • Tender Document
    • Tender Assistant
    • Supervision
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa and PT Cita Prisma - JO 2020-2023
  • Phase 1 :

    Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)
  • Phase 2 :

    Prepare SPAR, and Safeguard Documents
  • Phase 3 :

    Detail Surveys, Preparation of Bidding Documents
  • Phase 4:

    Procurement Support
  • Phase 5:

    Project Management and Construction Supervision
Review Design Consult Seaport Jetty&Trestle - OKI Seaport PT OKI Pulp & Paper Mills Main 2022-2023
    • Site Visit
    • Review Design
    • Contractor's Design Validation for Jetty & Trestle
Design And Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction(EARR) Port of Pantoloan, Donggala And Wani Central Sulawesi Province – Indonesia Ministry Of Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs PT Aecom Indonesia, PT Witteveen Bos Indonesia, PT Atrya Swascipta Rekayasa, and PT Cita Prisma - JO 2020-2023
  • Phase 1:
    Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP)
  • Phase 2 :
    Prepare SPAR, and Safeguard Documents
  • Phase 3 :
    Detail Surveys, Preparation of Bidding Documents
  • Phase 4 :
    Procurement Support
  • Phase 5 :
    Project Management and Construction Supervision
Rehabilitation Design of Container Yard and Drainage System in PT Jakarta International Container Terminal Due To West Jetty Construction and Sea Water Level Adjustment PT Jakarta International Container Terminal Main 2022-2023
  • Site Visit
  • Topographic Survey : 37 Ha
  • Container Yard Layout
  • Geotechnical Analysis
  • Design of Rigid Pavement on Container Yard
  • Design of Drainage System
  • Bill of Quantity & Cost Estimation
  • Technical Specification
  • Tender Document
Detailed Engineering Design and Supervision of Special Terminal Teluk Timbau in Central Kalimantan PT Mega Multi Energi Main 2022-2023
  • Detailed Engineering Design Structure Jetty
  • Detailed Engineering Design Conveyor and Material Handling Equipment
  • BoQ and Cost Estimation
  • Technical Specification
  • Tender Assistance
  • Supervision
Consultancy Service for Design the Major Repairment and Modification of Conveyor Belt Unit including Accessories owned by PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu PT Pelabuhan Indonesia (Persero) Regional 2 Bengkulu Main 2022-2023
  • Site Visit
  • Survey & data collection
  • Review and analysis bearing capacity
  • Dry Bulk Terminal Operational Study
  • Detailed Engineering Design of Conveyor Belt Repairment
  • Detailed Engineering Design of Modification Feeder and Loading System on Conveyor Belt A & C.
  • Engineering Drawing
  • Cost Estimation
  • Technical Specification
  • Tender Assistance
Topographic Survey and Benchmarking to Pelindo’s Reference in Block Double Area of PT JICT Terminal PT Jakarta International Termnal Main 2022
  • Topographic survey in Container Yard Area
  • Topography map
Independent Engineer Consultancy Services Work on The Construction of a 57-meter Container Yard in North Kalibaru Terminal, Tanjung Priok Port PT New Priok Container Terminal One and PT Pengembang Pelabuhan Indonesia Main 2021 -2022
  • To Study and understand the detailed design and technical specifications and drawings along with supporting data to understand the project
  • To review the construction methodology, quality, assurance, and quality control procedure and report on findings
  • To review and check quality Assurance / Quality Control records
  • To review construction drawings and project specification
Project, LocationOwner/Source of fundMain/AssociateYearJob Description
Soil Investigation of Floating Mosque Ancol PT Taman Impian Jaya Ancol Main 2019
  • Soil Investigation offshore (4 boring points & 4 CPT points)
Lameruru Port Master Plan Study Ministry of Transport Main 2019
  • Site Visit
  • Validation, analysis, and evaluation of data
  • Forum Group Discusion
  • Preparation Master Plan Lameruru
Soil Investigation North Side Lot A and B Ancol KSO Jaya Ancol – Crown Group Main 2019
  • Soil Investigation offshore (5 boring points)
Cost Estimation on Saumlaki Terminal Getaway Asia Arena Syscom Main 2019
  • Cost Estimation
Revitalization Plan for Multipurpose Area Sindulang, West Side Inggom Jetty Plan and Jetty & Ex. Walie Jaya Yard Retrofitting in Tanjung Priok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2019
  • Topographic Survey
  • Soil Investigation
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Consultancy and Design of Jetty Construction in Talisayan, Berau, East Kalimantan PT Dwiwira Lestari Jaya Main 2019
  • Detailed Engineering Design
  • Cost Estimation
  • Tender Document
Conceptual Study of Anthracite Loading Terminal in Chimbote, Peru Archean Andean Anthracite S, A Main 2019
  • Site Visit
  • Conceptual Layout Plan
  • Bill of Quantity
Project, LocationOwner/Source of fundMain/AssociateYearJob Description
Construction Supervision of Dredging at AKR West Nilam, Tanjung Perak, Surabaya PT AKR CORPORINDO, Tbk Main 2018
  • Supervision of Dredging Work
Jetty Design Validation on PT OKI Pulp & Paper Mills, Palembang PT OKI Pulp & Paper Mills Main 2018
  • Site Visit
  • Review Design
  • Jetty Validation
Survey, Investigation and Design Jetty, Bulukumba, South Sulawesi PT Mitra Dagang Makmur Main 2018
  • Site Visit - Topographic Survey
  • Soil Investigation
  • Hydro oceanography Survey
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Improvement & Rehabilitation Design Container Yard Ex. Pacific Paint Phase II and Ex. Perca Warehouse at Tanjung Priok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2018
  • Site Visit
  • Topographic Survey
  • Soil Investigation
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Jetty Consultancy Service, Lubuk Gaung, Dumai   Main 2018  
PT Sari Dumai Sejati /GLOBAL MARINE AND PORT SERVICES PTE LTD   Main 2018
  • Site Visit
  • Collecting Data
  • Assessment
  • Recommendation
Bathymetry Survey, West Nilam PT Terminal Nilam Utara Main 2018
  • Bathymetry Survey
Survey, Assessment and Review Design Jetty, West Nilam, Tanjung Perak, Surabaya PT AKR CORPORINDO, Tbk Main 2018
  • Site Visit
  • Bathymetry Survey
  • Current Survey
  • Design Review 2 Exsisting Dolphin and cultivation
  • Trestle Protective Structure Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Survey, Investigation and Design Jetty AKR, Banyuasin, South Sumatra PT AKR CORPORINDO, Tbk Main 2018
  • Site Visit
  • Soil Investigation
  • Hydro-Oceanography Survey
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Topographic Survey, Buntok PT AKR CORPORINDO, Tbk Main 2018
  • Topographic Survey
Supervision of Construction Work on Container Yard 115 and Ex Warehouse 114 Tanjung Priok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2018
  • Supervision
Measurement of Parking Area Situations on Dufan Plaza, East Coast, And Carnival PT Taman Impian Jaya Ancol Main 2018
  • Measurement Survey
  • Topographic Survey
Rehabilitation Design and Elevation Disposition of Container Yard 216X – 218X, Port of Tanjung Priok Port PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok Main 2018
  • Topographic Survey
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Survey and Design Jetty AKR Buntok, Muara Teweh - Central Kalimantan PT AKR CORPORINDO, Tbk Main 2018
  • Site Visit
  • Bathymetry Survey
  • Hydro-Oceanography Survey
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Soil Investigation Buntok, Muara Teweh, Central Kalimantan PT AKR CORPORINDO, Tbk Main 2018
  • Soil Investigation
Project, LocationOwner/Source of fundMain/AssociateYearJob Description
Construction Supervision of Jetty (100 x 25 M2) at Gorontalo Port PT Pelabuhan Indonesia IV (Makassar) Main 2017
  • Supervision
Assessment & Review Jetty Exsisting in PT Bhakti Mingasutama, Eretan, Indramayu, West Java PT Bhakti Mingasutama Main 2017
  • Assessment Survey
  • Bathymetry Survey
  • Review Design Jetty
Container Yard Alternative Design for Pontianak New Port PT Geotechnical Environmental Main 2017
  • Detailed Engineering
  • Cost Estimation
Assessment of Factory Building, Tangerang-Banten PT Kiantaka Rasa Main 2017
  • Assessment Survey
  • Recommendation
Assessment of AKR Tower Building (Second Stage), Kebon Jeruk - West Jakarta PT AKR CORPORINDO, Tbk Main 2017
  • Assessment Survey
  • The structure Test consists of Core Drill 9 Points, UPV Test 9 points, Corecterebar Scan18 points, Test Tilt Columns, and Deflection Beams
Detailed Engineering Design of Jetty and Trestle, Bontang, East Kalimantan PT EnergiUnggulPersada Main 2017
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Assessment of AKR Tower Building, Kebon Jeruk, West Jakarta PT AKR Corporindo, Tbk Main 2017
  • Assessment Survey
  • Recommendation
Topographic Survey of Bidadari Island PT Pembangunan Jaya Ancol, Tbk Main 2017
  • Topographic Survey
Survey and Soil Investigation of Industrial Estate Project, Bontang, East Kalimantan PT Sumatra Bulker Main 2017
  • Hydro-oceanography Survey
  • Soil Investigation
Structural Checking of Floating Restaurant Muara Angke, North Jakarta/td> PT Bobby & Team Main 2017
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Review Design Precast System PT Budi Perkasa Alam Main 2017
  • - Review Precast System
Floating Restaurant Muara Angke, North Jakarta - Structure Accredited Checker Consultant PT KeplandInvestama Main 2017
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
    Main 2017  
Conceptual Layout and DED Jetty Pontianak New Port PT Geotechnical Environmental service Indonesia Main 2017
  • Conceptual Layout
  • Detailed Engineering Design
  • Cost Estimation
Assessment Jetty Existing, Bitung - Sulawesi Utara PT AKR Corporindo, Tbk Main 2017
  • Site Visit
  • Data collection
  • Assessment for Existing Jetty
  • Recommendation
Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway ADB But Cardno Emerging Markets (Australia) PTY. LTD. 2017
  • Develop detailed and timetabled implementation plans and policy actions to deliver maritime and multimodal transport connectivity infrastructure projects for Sea Tollway implementation with supporting analyses, policy framework, capacity strengthening, and investment project pipeline
Project, LocationOwner/Source of fundMain/AssociateYearJob Description
Detailed Engineering Design of Jetty and Trestle in SeiSembilang, South Sumatra PT SumberHijauPermai Main 2016
  • Hydro–Oceanography Survey
  • Detailed Engineering Design of Jetty and Trestle
  • Cost Estimation
  • technical Specifications
  • Tender Document
  • ender Evaluation
DLKr DLKp Study for Depapre Port, Papua   Main 2016
  • Jayapura District Department of Transportation
  • Field survey
  • Validation, analysis, and evaluation of data.
  • Preparation DLKr DLKp Depapre.
Detailed Engineering and Design (DED), Donggala Port, Central Sulawesi Ministry of Transport (KementerianPerhubungan) Main 2016
  • Hydro–Oceanography Survey
  • Topographic Survey
  • Assessment Survey
  • Pile Thickness & Visual Check Survey
  • Soil Investigation
  • Review Existing Design
  • Detailed Engineering Design
  • Cost Estimation
  • Technical Specification
  • Tender Document
Review Design of Existing Jetty in Bitung Terminal, North Sulawesi PT.AKR Corporindo.Tbk Main 2016
  • Review Desain
  • Cost Estimation
SiteSelection and Location Determination for Ports in Indramayu Regency, West Java PT.Suryacipta Swadaya Main 2016
  • Site Selection
  • Review Study
  • Bathymetry Survey
  • Feasibility Study
  • Working Permit
Supervision of Basin Dredging in Jetty 3, Cilegon, West Java PT Krakatau Bandar Samudera Main 2016
  • Supervision
Project, Location Owner/Source of fund Main/Associate Year Job Description
Detailed Engineering Design and Planning Layout for Reclamation & Gabion Wall Kendari New Port Container Terminal, South-East Sulawesi Pelindo IV Main 2015
  • Detailed Engineering Design
  • Planning Layout for Reclamation & Gabion Wall
Construction Management of Jetty 7.3 and 4.5 ‐ 4.6 in CIlegon, West Java PT Krakatau Bandar Samudera PT Krakatau Konsultan 2015
  • Construction Supervision
  • Construction Management
Feasibility Coal Traffic in Tanjung Api‐Api, South Sumatera PT Indorama Synthetics, Tbk Main 2015
  • Analyze the coal traffic including obstacles on the river and all costs from the coal port to SEZ Tanjung Api‐Api
Topographic & Geotechnical Survey, Bojonegoro PT Elnusa, Tbk Main 2015
  • Topographic Survey
  • Geotechnical Investigation
Master Plan of Muntok Port, Bangka Belitung Province Tanjung Priok port of authority Main 2015
  • Feasibility Study
  • Port Master Plan
Sub Bottom Profilling Dermaga LNG at Cilegon PT Energi Dian Kemala Main 2015
  • Sub-bottom profiling investigation
  • Field survey
Preparation of study DLKR DLKP port of Sunda Kelapa Tanjung Priok port of authority Main 2015
  • Field survey/measurement of land and waters.
  • Validation, analysis, and evaluation of data.
  • Preparation DLKr DLKp of port.
Bathymetry survey, Soil Investigation, Detailed Engineering Design, Tender Evaluation, and Supervision of Construction Port at PT CS2 Pola Sehat, Banyuasin, South Sumatra, Indonesia PT CS2 PolaSehat Main 2015
  • Bathymetry Survey
  • Soil Investigation
  • Detailed Engineering Design
  • Tender Evaluation
  • Supervision
Detailed Engineering Design Of Bengkulu Coal Port Berthing Facility PT. Aurecon Indonesia Main 2015
  • Detailed Engineering Design
Conceptual of Jetty Layout in Senegal PT Synco Global Main 2015
  • Conceptual Design
Bathymetry survey, Tidal, and currents for Terminal Tarumanagara, Bekasi PT. Mega Agung Nusantara Main 2015
  • Bathymetry Survey
  • Tidal and Currents Survey
Impact Study Ling Way for PT Pelabuhan Tegar Indonesia PT PelabuhanTegar Indonesia Main 2015
  • Checking the structural capacity of trestle 1A against collides of empty barges. If the capacity is enough, then only truck tires will be installed to protect the concrete curbs of the wheel guard
  • Designing the fence along the trestle, if the capacity of the trestle, including technical specification and cost estimate
  • Designing the Navigation Aids for MCT Terminal

PROJECT ARTICLES

Terminal curah kering & Petikemas Tanjung Proik
18 July 2024
Terminal curah kering & Petikemas Tanjung Proik
PT. Diagram Triproporsi sebagai Konsultan yang melaksanakan Survei Investigasi Desain (SID)...
Project Articles
Belawan Port, Medan, North Sumatera
17 July 2024
Belawan Port, Medan, North Sumatera
PT DIAGRAM TRIPROPORSI - Jakarta bekerja sama dengan PT. VINI NUSANTARA CONSULTANT – Medan untuk...
Project Articles
Depapre port Project, Jayapura, Papua
17 July 2024
Depapre port Project, Jayapura, Papua
Kondisi kualitas pelayanan Pelabuhan Jayapura di Kota Jayapura saat ini terindikasi sudah...
Project Articles
Palaran Port, Samarinda, East Kalimantan
17 July 2024
Palaran Port, Samarinda, East Kalimantan
Kota Samarinda sebagai ibukota Propinsi Kalimantan Timur merupakan wilayah daratan yang dibelah...
Project Articles
RIP Khusus minyak dan gas bumi Pertamina Balongan
17 July 2024
RIP Khusus minyak dan gas bumi Pertamina Balongan
Ringkasan Eksekutif Master Plan Pelabuhan Balongan ini adalah Laporan ke lima yang disusun oleh...
Project Articles
Rencana Induk Pelabuhan Dumai
17 July 2024
Rencana Induk Pelabuhan Dumai
Ringkasan Eksekutif Master Plan Pelabuhan Dumai ini adalah panduan untuk pengembangan pelabuhan...
Project Articles
Kariangau Port, Balikpapan, East Kalimantan
17 July 2024
Kariangau Port, Balikpapan, East Kalimantan
PT. DIAGRAM TRIPROPORSI selaku Konsultan Supervisi dan desain untuk pelaksanaan Proyek Pembangunan...
Project Articles
Adani Tanjung Carat Project
16 July 2024
Adani Tanjung Carat Project
PT ADANI GLOBAL berencana untuk membangun pelabuhan khusus yang akan melayani pengangkutan...
Project Articles

Contact Us

Do you have question?
Do not wait, let’s talk

ptdiagram@diagramtriproporsi.com

Head Office

Agnesia Building 1st floor,
Jl. Pemuda 73B Jakarta 13220
Indonesia
Telp. +62 (021) 4701356/57
ptdiagram@diagramtriproporsi.com

Website Menu

  • Home
  • About Us
  • Projects
  • Article
  • Contact Us

Current Visitors

We have 390 guests and no members online

© 2026 Diagram Triproporsi. All right reserved
  • Home
  • About Us
  • Projects
    • On Going Project
    • Project Experiences
    • Project Gallery
  • Article
  • Contact Us