No ProjectOwnerMain / AssociateYearDescriptions
1Construction Management for Dredging Jetty 4 & 7 port Basin, PT KBS Construction PT Krakatau Bandar Samudera Main 2016 Construction Management for Dredging Jetty 4 & 7 port Basin, PT KBS Construction
2 Construction Management for Jetty 7.3 and 4.5 - 4.6 Construction PT Krakatau Bandar Samudera Main 2016 Construction Management for Jetty 7.3 and 4.5 - 4.6 Construction
3 EXisting jetty Assesment, Bitung, North Sulawesi PT. AKR Main 2016 EXisting jetty Assesment, Bitung, North Sulawesi
4Structure Check for Floating Restaurant in Muara Angke, DKI Jakarta PT. Keppel Land Main 2017 Structure Check for Floating Restaurant in Muara Angke, DKI Jakarta
5Topografi dan Bathymetric Survey in Bidadari Island, North Jakarta PT Jaya Ancol Main 2017 Topografi dan Bathymetric Survey in Bidadari Island, North Jakarta
6Survey dan Soil Investigation Bontang PT GAMA Main 2017 Survey dan Soil Investigation Bontang
7Sea Toll Way study, Carno and ADB World Bank Cardno Indonesia Main 2017 Sea Toll Way study, Carno and ADB World Bank
8Studi Alur Pelayaran Lematang, Boom Baru PT. Titan Mining Main 2016 Studi Alur Pelayaran Lematang, Boom Baru
9Layout & Design Pontianak port PT. golder Associates Main 2017 Layout & Design Pontianak port
10Assesment AKR Tower PT. AKR Main 2017 Assesment AKR Tower
No ProjectOwnerMain / AssociateYearDescriptions
1Design of Breasting Dolphin Capacity at Howe India PT. Adani Global Main 2016   Review design of breasting dolphin capacity of pile diameter
2 Survey, Soil Investigation and Bathymetry at Muntok, Bangka Belitung Province PT. Muntok Listrik Utama Main 2016   - Bathymetry and Oceanography Survey
  - Soil Investigation
3 Detailed Engineering Design for Donggala Port at Central Sulawesi Province Ministry of Transportation Republic of Indonesia Main 2016   - Detailed Engineering Design (Re-Design Jetty)
  - Bill of Quantity, Cost Estimate and Tender Document
4Construction Supervision PT Krakatau Bandar Samudera Main 2016   Supervision of turning basin Dredging
5Assesment & design review existing jetty, Lubuk Gaung, Dumai PT. Ivomas Tunggal Main 2016   - Review design of jetty existing in Dumai   - Site Survey for assesment
6Design of Jetty Existing at Bitung terminal – North Sulawesi Province PT. AKR Corporindo, Tbk Main 2016   Review design of jetty existing
7Master Plan of Depapre Port Provincial Government of Papua Province – Jayapura District Main 2016   Review of port master plan -(Depapre port)
88 Port Location Study at Indramayu, West Java Province PT. Suryacipta Swadaya Main 2016   Supervision of port location - Survey of select location - Port layout design
No ProjectOwnerMain / AssociateYearDescriptions
1 Detailed Engineering Design and Planning Layout Reclamation & gabion wall Kendari New Port Container Terminal Pelindo IV Main 2015   - Detailed engineering design
  - Planning layout reclamation & gabion wall
2Construction Management of Jetty 7.3 and 4.5 - 4.6 PT Krakatau Bandar Samudera main 2015   - Construction Supervision   - Construction management
3Feasibility the coal traffic at Tanjung Api- Api PT Indorama Synthetics, Tbk Main 2015 Analyze the coal traffic including obstacles on the river and all cost from coal port to SEZ Tanjung Api-Api
4Topography & Geotechnical Survey, Bojonegoro PT Elnusa, Tbk Main 2015   - Topograpy survey   - Geotechnical survey
5Master Plan of Muntok Port, Bangka Belitung Province Port Authority Office Tanjung Priok Main 2015   - Feasibility Study   - Port Master Plan
6Subbottom Profilling Survey of LNG Port, Cilegon, Banten PT Energi Dian Kemala Main 2015 Subbottom Profilling Survey
7Study of Working Area (DLKr) and Interest Area (DLKP), Port of Sunda Kelapa, Jakarta Port Authority Office Tanjung Priok Main 2015 Site Survey and Investigation Preparation of Working Area and Interest Area
8 Survey, Investigation and Design of PT. CS2 Pola Sehat Jetty, Banyuasin Sungai Musi, South Sumatera PT CS2 Pola Sehat Main 2015   - Bathymetry dan Oceanography Survey
  - Soil Investigation
  - Detailed Engineering Design
  - Bill of Quantity, Cost Estimate dan Tender Document
  - Supervision of Port Construction
9Detailed Engineering Design of Coal Port Berthing Facility, Port of Bengkulu, Bengkulu PT. Pelabuhan Indonesia II Aurecon Indonesia 2015   - Detailed Engineering Design
  - Cost Estimate
10Conceptual Design of Coal Port Jetty at Senegal, Afrika PT. Synco Global Main 2015   - Conceptual Design
  - Port Layout Selection
11Design of Coal Port Jetty at Kelanis Selatan, East Kalimantan PT. Adaro Indonesia PT SWI Jetty Nusantara 2015   - Port Design Review
  - Jetty Design to increase Port Capacity from 8000 DWT to 18000 DWT vessels.
12Design of Jetty and Trestle for Indonesia Power Plant Project at Cilegon, West Java PT Tenaga Listrik Cilegon PT Tosplant Engineering Indonesia   - Basic Design of Jetty and Trestle
  - Preparation of Technical Specification
  - Preparation of Tender Document
13Bathymetry and Hydro-oceanography Survey for Tarumanegara Port in Bekasi Utara, West Java PT. Mega Agung Nusantara Main 2015 Bathymetry and Hydro-Oceanography Survey
14Design of Liquid Bulk Jetty, Bitung, North Sulawesi PT. Aneka Kimia Raya Bitung Main 2015 Jetty Repair Design
15Impact study Link Way PT Pelabuhan Tegar Indonesia Main 2015   - Design Review
  - Design of Navigational Aids
  - Preparation of Technical Specification
  - Cost Estimate
No ProjectOwnerMain / AssociateYearDescriptions
1Detailed Engineering Design of Pier and Slipway Dock, for Supply Base Terminal , at Pendingin, East Kalimantan PT Elnusa, Tbk Main 2014   - Site Visit
  - Detailed Engineering Design
  - Cost Estimate
  - Tender document
2 Design of Seaport Facility in Sangatta, East Kalimantan   PT Waskita Karya Main 2014   Design Review
3Design of Access Road to Marunda Terminal, Jakarta PT Multikon Indrajaya Terminal Main 2014   Conceptual Design
4Detailed Engineering Design of PipeRack Construction for Terminal Marunda Center Fase 1A , Jakarta PT Pelabuhan Tegar Indonesia Main 2014   - Detailed Engineering Design
  - Tender Evaluation
  - Supervision
5Design of Jetty for AKR, Nilam Utara, Tanjung Perak, Surabaya, East Java PT SWI Jetty Nusantara Main 2014   - Site Survey   - Design Review
5Detailed Engineering Design of Tanjung Priok Port Jetty, Jakarta PT. Pelabuhan Indonesia II , Tanjung Priok Main 2014   - Topographic Survey
  - Bathymetry and Tidal Survey
  - Soil Investigation
  - Detailed Engineering Design
6Master Plan of Container Terminal at Depapre Port, Jayapura, Papua Transportation Agency of Jayapura / APBD Main 2014   - Feasibility Study
  - Port Master Plan
7 Design of Jetty and Infrastructure for Cluster NPK Chemicals, East Kalimantan PT Pupuk Kaltim KJJP Antonius Setiady & Rekan 2014   - Basic Design
  - Feasibility Study
No ProjectOwnerMain / AssociateYearDescriptions
1Management Construction Of Jetty 5 in area TUKS PT Krakatau Steel, Tbk PT Krakatau Bandar Samudera Main 2013 - Construction Supervision
- Coordination Meetings
- Design Revision
2Provide professional Consulting of common port/marine construction practices in support of the Port of Tanjung Priok Container Terminal Concession Cardno TECH Main 2013 Review Cost Estimate
3Conceptual Design of The New Port at Bunyu Island, East Kalimantan PT Adani Global Main 2013 - Site Visit to the proposed port locations to review the natural and traffic conditions as well to perform roughly depth measurements
- Data Collection which gathers maps, information from local Contractor and local material shops about labor,material and equipment unit price
- Site Selection which is based on technical, and operational aspects
- Conceptual design of the coal port which is consist of trestle and dolphin
- Rough cost estimate of the trestle and dolphin
- Rough layout of the material handling system using existing system location
4 Design jetty and trstle of Project power plant construction Parit Baru 2 x 50 Mw at Site Bengkayang PT Praba Indopersada Main 2013-2014 - Basic Design
- Detailed Engineering Design
5 Review Design Structure Of Bridge Steel Frame at Bahau River PT Waskita Karya Main 2013-2014 Review Design
No ProjectOwnerMain / AssociateYearDescriptions
1Design Construction Works of Bridge Hopper, South Kalimantan PT Waskita Karya Divisi V Main 2012 Review of existing design
2Geo-electric Survey on PT Mitra Niaga Mulia Area in Bunyu, East Kalimantan PT Mitra Niaga Mulia UPN Yoyakarta 2012 - Geo-electric Survey
- Analysis of survey results
3Geotechnical Study on Mining Activities of PT Lamindo Inter Multikon in Bunyu, East Kalimantan PT Lamindo Inter Multikon UPN Yoyakarta 2012 - Soil Investigation
- Analysis of stability
4Conceptual Design of 4 ( Four) Coal Terminals (PT . TDGP Coal Terminal, PT SRI Coal Terminal, PT KGB Coal Terminal, CV ABE Coal Terminal ) in Kalimantan PT. Exploitasi Energi Indonesia, Tbk Main 2012 - Conceptual design of 4 coal terminals
- Cost Estimate Preparation
5Survey Investigation Design of PT TDGP Coal Terminal PT TDGP in Tanah Laut, South Kalimantan PT. Exploitasi Energi Indonesia, Tbk Main 2012 - Topographic Survey
- Bathymetric Survey
- Soil Investigation
- Laboratory Analysis
- Coal Terminal Lay Out Preparation
- Detailed Design of Coal Terminal
6Pre-Review and Review / Re-Design of Reclamation PT Pandega Citraniaga Main 2012 - Design Revetment and Reclamation
- Soil Improvement
- Settlement Estimate
- Cost Estimation & Bill of Quantity
- Tender Assistance
- Construction Supervision
- Coordination Meetings
- Design Revision
7Review Design for Power House, MCC Room, Control Room, Pump House and Shear Connector of Tapin Coal Terminal Project, South Kalimantan PT Waskita Karya Main 2012 Review Design of Power House, MCC Room, Control Room, Pump House and Shear Connector
8 Design Of Reclamation at Green Bay, Pluit Jakarta PT Kencana Unggul Sukses Main 2012 - Detailed Engineering Design
- Cost Estimate
- Tender Document
9Review Work of Hopper Bridge Pillars P20, P30, P34 and P38, South Kalimantan PT Waskita Karya Main 2012 - Review of Existing Design
- Detailed Engineering Design
10Unloading Calculation Works for 7 Days of Formwork, South Kalimantan PT Waskita Karya Main 2012 Unloading Design
11Services Development Project of Greater Makassar Port, South Sulawesi Province Port Authority of Region IV Office of Makassar Main 2012 Review Of Port Master Plan
12 Survey, Investigation and Design of Wharf, at Lais River, Palemban, South Sumatra PT Pelindo II, Palembang Main 2012 - Topographic Survey
- Bathymetric Survey
- Soil Investigation
- Laboratory analysis
- Detailed Design
- Cost Estimate
- Tender Document
13Review Design Structur Oprit Hopper Bridge and Jayo Bridge PT Waskita Karya Main 2012 Review Design
No ProjectOwnerMain / AssociateYearDescriptions
1Detailed Engineering Design of PT Lestari Samudera Jetty, Balikpapan, East Kalimantan PT Multi Pondasi Utama Main 2011

- Collecting data

- Bathymetry survey

- Tidal observation

- Geotechnical analysis

- Detailed engineering design of jetty and its facilities

2Feasibility Study on Coal Transportation Development on Musi River, South Sumatera Pelindo II Sub consultant of Haskoning Indonesia 2011

Examining further viability of development of coal transport facilities on the Musi River which includes:

- Land/river transshipment elements

- River transportation elements

- Marine transshipment facility elements

- Preparation of the input s for the AMDAL process

3Bid Documents Evaluation for Jetty II of PT Pertamina (Persero) RU II Sei Pakning Rehabilitation Project, Riau Province PT. Pertamina RU-II Main 2011 Tender Assistance
4 Bathymetric Survey and Revetment Design for Marina M Walk Project, North Sulawesi PT Tiga Karya Wenang Main 2011

- Bathymetric Survey

- Revetment design

5Provision of Matak Land Study, Riau Province Premier Oil Natuna Sea B.V. Witteveen+Boss Indonenesia 2011

- Soil Investigation Works

- Topographic Survey

- Bathymetric Survey

- Basic Design of Stockyard and Port Infrastructure

- Cost Estimate

6Feasibility Study of Container Ports Development at Pontianak, Palembang and Bengkulu Pelindo II Main 2011

- Master Plan

- Feasibility Study (Technical, Economical & Environmental)

7Master Plan of LNG Floating Storage Regasifification Special Terminal for East Java – Central Java Unit in Tanjung Mas Port, Semarang, Central Java PT Pertamina (Persero) – LKFT UGM & UNDIP Sub consultant of LKFT UGM & UNDIP 2011

- Site Visit

- Master Plan

8EPCM Consultant Services Procurement Two (2) Unit Hopper 750 Ton per Hour, Banten Province PT Krakatau Bandar Samudera Main 2011 - Engineering Design
- Tender Assistance
- Supervision Works
9Conceptual Design of : Jetty, Trestle and On-Land Facilities, Madura Island PT Adani Global Main 2011 - Preliminary Design of Trestle and Mooring Dolphins
- Preliminary Design of Service Road along Trestle
- Preliminary Design of Coal Stockpiles Yard
- Lay-out of Stacker Re-claimer to Blend Coal
- Design Lay-out of Conveyor in Stockpile Yard
- Design Lay-out of Conveyor from Stockpile Yard to Power Plant Processing Mill
- Conceptual Coal Estimate
10 Phase I - Site Selection Project of Coal River Port in Malinau, East Kalimantan PT Choice Plus Energy Main 2011 - Data Collection
- Site Visit
- Bathymetri Survey
- Conceptual Design
NoProjectOwnerMain / AssociateYearDescriptions
1Jetty II of PT. Pertamina RU II Assessment and Rehabilitation Engineering Design, Sungai Pakning – Riau PT. Pertamina RU-II Main 2010

- Assessment & Engineering Design of Jetty II RU II

- Assessment of Existing Jetty Condition Damaged by Ship

- Design of Jetty Rehabilitation

2Lhokseumawe Port Traffic Analysis, Nanggroe Aceh Darussalam PT. Rekayasa Engineering Main 2010

- Ship Traffic Study

- Pupuk Iskandar Muda Jetty and Facilities Extension Lay-out

3 Existing Jetty Pile Capacity Analysis at Amamapare Port, Timika – Papua PT. Swi Jetty Nusantara Main 2010

- Pile Capacity Analysis

- Remaining Service Life Study

4 Railway Track Soil Investigation, Tanjung Enim – South Sumatera PT. Adani Global Main 2010

- 240 km Stretch Soil Sampling/Boring from Tanjung Enim to Tanjung Api Api

- Soil Laboratory/Testing

- Soil Sampling/Boring

- Soil Laboratory/Testing - Dutch Cone Penetration Test

5 Offshore Handling Facilities and Jetty Preliminary Design, Tanjung Carat – South Sumatera PT. Adani Sumsel Main 2010

- Cost Estimate and Preliminary Design of 200.000 DWT Coal Ship Jetty

- Design of 10.000.000 m 3 Reclamation

About Us

PT. Diagram Triproporsi Engineering Consultant was founded in 1980 with intensive projects portfolio in ports, harbors and urban drainage. Read more...

Contact Info

MAIN OFFICE :

+62 (021) 4701356
+62 (021) 4701357

+62 (021) 4720895
+62 (021) 4892042
HP: +628161815803

E-mail : project@diagramtriproporsi.com
             ir.nani.setiawan@gmail.com

ADDRESS :

Agnesia Building 2nd floor, Jl. Pemuda 73B Jakarta Indonesia 13220

Location