No Project Owner / Sources Of Fund Main / Associate Year Descriptions
1 Design of Breasting Dolphin Capacity at Howe India PT. Adani Global Main 2016
  • Review design of breasting dolphin capacity of pile diameter
2 Survey, Soil Investigation and Bathymetry at Muntok, Bangka Belitung Province PT. Energi Dian Kemala Main 2016
  • Bathymetry and Oceanography Survey
  • Soil Investigation
  • Bill of Quantity, Cost Estimate
3 Detailed Engineering Design for Donggala Harbor at Central Sulawesi Province Ministry of Transportation Republic of Indonesia Main 2016
  • Detailed Engineering Design
  • Bill of Quantity, Cost Estimate and Tender Document
4 Construction Supervision PT Krakatau Bandar Samudera Main 2016
  • Supervision of harbor turning basin
5 Assesment & design review existing jetty PT. Smart Tbk in Dumai PT. Ivomas Tunggal Main 2016
  • Review design of jetty existing in Dumai
  • Site Survey for assesment
6 Design of Jetty Existing at Bitung terminal – North Sulawesi Province PT. AKR Corporindo, Tbk Main 2016
  • Review design of jetty existing
7 Master Plan of Depapre
Port
Provincial Government of Papua Province – Jayapura District Main 2016
  • Review of port master plan -(Depapre port).
8 Port Location Study at Indramayu; West Java Province PT. Suryacipta Swadaya Main 2016
  • Supervision of port location - Survey of select location - Port layout design
9 Detailed Engineering Design and Planning Layout Reclamation & gabion wall Kendari New Port Container Terminal Pelindo IV Main 2015
  • Detailed engineering design
  • Planning layout reclamation & gabion wall
10 Construction Management of Jetty 7.3 and 4.5 - 4.6 PT Krakatau Bandar Samudera Main 2015
  • Construction Supervision
  • Construction management
11 Feasibility the coal traffic at Tanjung Api- Ap PT Indorama
Synthetics, Tbk
Main 2015
  • Analyze the coal traffic including obstacles on the river and all cost from coal port to SEZ Tanjung Api-Api
12 Topography & Geotechnical Survey, Bojonegoro PT Elnusa, Tbk Main 2015
  • Topograpy survey
  • Geotechnical survey
13

Master Plan of Muntok Port, Bangka Belitung Province

Port Authority Office Tanjung Priok

Main

2015
  • Feasibility Study
  • Port Master Plan
14

Subbottom Profilling Survey of LNG Port, Cilegon, Banten

PT Energi Dian Kemala

Main

2015
  • Subbottom Profilling Survey
15

Study of Working Area (DLKr) and Interest Area (DLKP), Port of Sunda Kelapa, Jakarta

Port Authority Office Tanjung Priok

Main

2015
  • Site Survey and Investigation
  • Preparation of Working Area and Interest Area
16

Survey, Investigation and Design of PT. CS2 Pola Sehat Jetty, Banyuasin Sungai Musi, South Sumatera

PT CS2 Pola Sehat

Main

2015 
  • Bathymetry dan Oceanography Survey
  • Soil Investigation
  • Detailed Engineering Design
  • Bill of Quantity, Cost Estimate dan Tender Document
  • Supervision of Port Construction
17

Detailed Engineering Design of Coal Port Berthing Facility, Port of Bengkulu, Bengkulu

PT. Pelabuhan Indonesia II

Aurecon Indonesia

2015
  • Detailed Engineering Design
  • Cost Estimate
18

Conceptual Design of Coal Port Jetty at Senegal, Afrika

PT. Synco Global

Main

 

2015
  • Conceptual Design
  • Port Layout Selection
19

Design of Coal Port Jetty at Kelanis Selatan, East Kalimantan

PT. Adaro Indonesia PT SWI Jetty Nusantara 2015
  • Port Design Review
  • Jetty Design to increase Port Capacity from 8000 DWT to 18000 DWT vessels.
10

Design of Jetty and Trestle for Indonesia Power Plant Project at Cilegon, West Java

PT Tenaga Listrik Cilegon PT Tosplant Engineering Indonesia 2015
  • Basic Design of Jetty and Trestle
  • Preparation of Technical Specification
  • Preparation of Tender Document
20

Bathymetry and Hydro-oceanography Survey for Tarumanegara Port in Bekasi Utara, West Java

PT. Mega Agung Nusantara Main 2015
  • Bathymetry and Hydro-Oceanography Survey
21

Design of Liquid Bulk Jetty, Bitung, North Sulawesi

PT. Aneka Kimia Raya Bitung Main 2015
  • Jetty Repair Design
22

Impact study Link Way

PT Pelabuhan Tegar Indonesia Main 2015
  • Design Review
  • Design of Navigational Aids
  • Preparation of Technical Specification
  • Cost Estimate
 23

Design of Jetty and Infrastructure for Cluster NPK Chemicals, East Kalimantan

PT Pupuk Kaltim KJJP Antonius Setiady & Rekan 2014
  • Basic Design
  • Feasibility Study
 24

Master Plan of Container Terminal at Depapre Port, Jayapura, Papua

Transportation Agency of Jayapura / APBD  Main  2014
  • Feasibility Study
  • Port Master Plan
 25 Detailed Engineering Design of Tanjung Priok Port Jetty, Jakarta PT. Pelabuhan Indonesia II , Tanjung Priok Main 2014
  • Topographic Survey
  • Bathymetry and Tidal Survey
  • Soil Investigation
  • Detailed Engineering Design
 26 Design of Jetty for AKR, Nilam Utara, Tanjung Perak, Surabaya, East Java PT SWI Jetty Nusantara Main 2014
  • Site Survey
  • Design Review
 27 Detailed Engineering Design of PipeRack Construction for Terminal Marunda Center Fase 1A , Jakarta PT Pelabuhan Tegar Indonesia   Main 2014
  • Detailed Engineering Design
  • Tender Evaluation
  • Supervision
 28 Design of Access Road to Marunda Terminal, Jakarta PT Multikon Indrajaya Terminal Main 2014
  • Conceptual Design
 29

Design of Seaport Facility in Sangatta, East Kalimantan

PT Waskita Karya Main 2014
  • Design Review
30

Detailed Engineering Design of  Pier and Slipway Dock, for Supply Base Terminal , at Pendingin, East Kalimantan

PT Elnusa, Tbk Main 2014
  • Site Visit
  • Detailed Engineering Design
  • Cost Estimate
  • Tender document
31 Review Design Structure Of Bridge Steel Frame at Bahau River PT Waskita Karya Main 2013-2014 Review Design
32 Design jetty and trstle of Project power plant construction Parit Baru 2 x 50 Mw at Site Bengkayang PT Praba Indopersada Main 2013-2014
  • Basic Design
  • Detailed Engineering Design
33 Conceptual Design of The New Port at Bunyu Island, East Kalimantan PT Adani Global Main 2013
  • Site Visit to the proposed port locations to review the natural and traffic conditions as well to perform roughly depth measurements
  • Data Collection which gathers maps, information from local Contractor and local material shops about labor,material and equipment unit price
  • Site Selection which is based on technical, and operational aspects
  • Conceptual design of the coal port which is consist of trestle and dolphin.
  • Rough cost estimate of the trestle and dolphin
  • Rough layout of the material handling system using existing system location
34 Provide professional Consulting of common port/marine construction practices in support of the Port of Tanjung Priok Container Terminal Concession. Cardno TECH Main 2013 Review Cost Estimate
35 Management Construction Of Jetty 5 in area TUKS PT Krakatau Steel, Tbk PT Krakatau Bandar Samudera Main 2013
  • Construction Supervision
  • Coordination Meetings
  • Design Revision
36 Review Design Structur Oprit Hopper Bridge and Jayo Bridge PT Waskita Karya Main 2012 Review Design
37 Survey, Investigation and Design of Wharf, at Lais River, Palemban, South Sumatra PT Pelindo II, Palembang Main 2012
  • Topographic Survey
  • Bathymetric Survey
  • Soil Investigation
  • Laboratory analysis
  • Detailed Design
  • Cost Estimate
  • Tender Document
38

Services Development Project of Greater Makassar Port, South Sulawesi Province

Port Authority of Region IV Office of Makassar Main 2012 Review Of Port Master Plan
39

Unloading Calculation Works for 7 Days of Formwork, South Kalimantan

PT Waskita Karya Main 2012 Unloading Design
40

Review Work of Hopper Bridge Pillars P20, P30, P34 and P38, South Kalimantan

PT Waskita Karya Main 2012
  • Review of Existing Design
  • Detailed Engineering Design
41

Design Of Reclamation at Green Bay, Pluit Jakarta

PT Kencana Unggul Sukses Main 2012
  • Detailed Engineering Design
  • Cost Estimate
  • Tender Document
42

Review Design for Power House, MCC Room, Control Room, Pump House and Shear Connector of Tapin Coal Terminal Project, South Kalimantan

PT Waskita Karya Main 2012
  • Review Design of Power House, MCC Room, Control Room, Pump House and Shear Connector
43

Pre-Review and Review / Re-Design of Reclamation

PT Pandega Citraniaga
Main
2012
  • Design Revetment and Reclamation
  • Soil Improvement
  • Settlement Estimate
  • Cost Estimation & Bill of Quantity
  • Tender Assistance
  • Construction Supervision
  • Coordination Meetings
  • Design Revision
44
Survey Investigation Design of PT TDGP Coal Terminal PT TDGP in Tanah Laut, South Kalimantan

PT. Exploitasi Energi Indonesia, Tbk

Main
2012
  • Topographic Survey
  • Bathymetric Survey
  • Soil Investigation
  • Laboratory Analysis
  • Coal Terminal Lay Out Preparation
  • Detailed Design of Coal Terminal
45

Conceptual Design of 4 ( Four) Coal Terminals (PT . TDGP Coal Terminal, PT SRI Coal Terminal, PT KGB Coal Terminal, CV ABE Coal Terminal ) in Kalimantan

PT. Exploitasi Energi Indonesia, Tbk

Main
2012
  • Conceptual design of 4 coal terminals
  • Cost Estimate Preparation
46

Geotechnical Study on Mining Activities of PT Lamindo Inter Multikon in Bunyu, East Kalimantan

PT Lamindo Inter Multikon
UPN Yoyakarta
2012
  • Soil Investigation
  • Analysis of stability
47
Geo-electric Survey on PT Mitra Niaga Mulia Area in Bunyu, East Kalimantan
PT Mitra Niaga Mulia
UPN Yoyakarta
2012
  • Geo-electric Survey
  • Analysis of survey results.
48
Design Construction Works of Bridge Hopper, South Kalimantan
PT Waskita Karya Divisi V
Main
2012

Review of existing design

49
Phase I - Site Selection Project of Coal River Port in Malinau, East Kalimantan
PT Choice Plus Energy
Main
2011
  • Data Collection
  • Site Visit
  • Bathymetri Survey
  • Conceptual Design
50

Conceptual Design of : Jetty, Trestle and On-Land Facilities, Madura Island

PT Adani Global
Main
2011
  • Preliminary Design of Trestle and Mooring Dolphins
  • Preliminary Design of Service Road along Trestle
  • Preliminary Design of Coal Stockpiles Yard
  • Lay-out of Stacker Re-claimer to Blend Coal
  • Design Lay-out of Conveyor in Stockpile Yard
  • Design Lay-out of Conveyor from Stockpile Yard to Power Plant Processing Mill
  • Conceptual Coal Estimate
51
Review Design of PT Tunas Baru Lampung Jetty, Lampung Province
PT Swi Jetty Nusantara
Main
2011

Review of existing design

52
EPCM Consultant Services Procurement Two (2) Unit Hopper 750 Ton per Hour, Banten Province
PT Krakatau Bandar Samudera
Main
2011
  • Engineering Design
  • Tender Assistance
  • Supervision Works
53

Master Plan of LNG Floating Storage Regasifification Special Terminal for East Java – Central Java Unit in Tanjung Mas Port, Semarang, Central Java

PT Pertamina (Persero) – LKFT UGM & UNDIP
Sub consultant of LKFT UGM & UNDIP
2011
  • Site Visit
  • Master Plan
54
Feasibility Study of Container Ports Development at Pontianak, Palembang and Bengkulu
Pelindo II
Main
2011
  • Master Plan
  • Feasibility Study (Technical, Economical & Environmental)
55
Provision of Matak Land Study, Riau Province
Premier Oil Natuna Sea B.V.
Witteveen+Boss Indonenesia
2011
  • Soil Investigation Works
  • Topographic Survey
  • Bathymetric Survey
  • Basic Design of Stockyard and Port Infrastructure
  • Cost Estimate
56

Bathymetric Survey and Revetment Design for Marina M Walk Project, North Sulawesi

PT Tiga Karya Wenang
Main
2011
  • Bathymetric Survey
  • Revetment design
 
57
Bid Documents Evaluation for Jetty II of PT Pertamina (Persero) RU II Sei Pakning Rehabilitation Project, Riau Province
PT. Pertamina RU-II
Main
2011
Tender Assistance
58
Feasibility Study on Coal Transportation Development on Musi River, South Sumatera
Pelindo II
Sub consultant of Haskoning Indonesia

2011

Examining further viability of development of coal transport facilities on the Musi River which includes;

  • Land/river transshipment elements
  • River transportation elements
  • Marine transshipment facility elements
  • Preparation of the input s for the AMDAL process
59
Detailed Engineering Design of PT Lestari Samudera Jetty, Balikpapan, East Kalimantan
PT Multi Pondasi Utama
Main
2011
  • Collecting data
  • Bathymetry survey
  • Tidal observation
  • Geotechnical analysis
  • Detailed engineering design of jetty and its facilities
 
60
Offshore Handling Facilities and Jetty Preliminary Design, Tanjung Carat – South Sumatera
PT. Adani Sumsel
Main
2010
  • Cost Estimate and Preliminary Design of 200.000 DWT Coal Ship Jetty
  • Design of 10.000.000 m 3 Reclamation
61
Railway Track Soil Investigation, Tanjung Enim – South Sumatera
PT. Adani Global
Main
2010
  • 240 km Stretch Soil Sampling/Boring from Tanjung Enim to Tanjung Api Api
  • Soil Laboratory/Testing
62
Tanjung Carat Port Soil Investigation, South Sumatera
PT. Adani Global
Main
2010
  • Soil Sampling/Boring
  • Soil Laboratory/Testing
63
Railway Track Soil Investigation, Tanjung Enim/Tanjung Carat – South Sumatera
PT. Adani Global
Main
2010
Soil Laboratory/Testing - Dutch Cone Penetration Test
64
Existing Jetty Pile Capacity Analysis at Amamapare Port, Timika – Papua
PT. Swi Jetty Nusantara
Main
2010
  • Pile Capacity Analysis
  • Remaining Service Life Study
65
Lhokseumawe Port Traffic Analysis, Nanggroe Aceh Darussalam
PT. Rekayasa Engineering
Main
2010
  • Ship Traffic Study
  • Pupuk Iskandar Muda Jetty and Facilities Extension Lay-out
66
Jetty II of PT. Pertamina RU II Assessment and Rehabilitation Engineering Design, Sungai Pakning – Riau
PT. Pertamina RU-II
Main
2010
  • Assessment & Engineering Design of Jetty II RU II
  • Assessment of Existing Jetty Condition Damaged by Ship
  • Design of Jetty Rehabilitation
67
Kariangau Container Terminal Construction Supervision, Balikpapan Port, East Kalimantan
PT. Pelabuhan Indonesia IV
Main
2009-2012
Construction Supervision of 3 Facilities: Wharf and Trestle; Reclamation of Container Yard; Access Road, Building and Utilities
68
Railway Preliminary Design for Tanjung Enim - Simpang - Tanjung Carat, South Sumatera
PT. Gemilang Pusaka Pertiwi
Main

2009

Conceptual Design of Coal Train Railway from Tanjung Enim Baru Station to Tanjung Carat Station through Simpang Station and Prabumulih Station
69
Revetment and Reclamation Detailed Design for Green Bay Apartment Buildings, Pluit – North Jakarta

PT. Kencana Unggul Sukses

(PT. Agung Podomoro Group)
Main

2009

Design of Revetment and Reclamation
70
Brondong Port Master Plan, East Java
Directorate General of Sea Communication
APBN
2009
  • Various Surveys
  • Master Planning
71
Reclamation and Retaining Wall Design for Sea View Water Front Project, Balikpapan – East Kalimantan
PT. Sesi Properti Indonesia
Main

2009

  • Tide Monitoring
  • Design of Reclamation and Retaining Wall
72
Coal Port Development, East Kalimantan
PT. Jembayan Muara Bara
Main
2009
  • Reconnaissance Survey
  • Site Selection
73

Belawan Port Development (Development of Container Terminal Phase I) Design, North Sumatera

PT. Pelabuhan Indonesia I
PT. Vini Nusantara Consultant

2009

  • Bathymetric Survey
  • Soil Investigation
  • Design of Soil Improvement & Reclamation
  • Design of Port and Container Yard
  • Pre-Construction
74
Matak Reclamation Yard Design and Construction Supervision, Natuna Island – Riau
ConocoPhillips Indonesia Inc. Ltd
Witteveen+Bos Indonesia

2009

  • Design of Reclamation
  • Construction Supervision
75
Coal Logistic Study, South Sumatera
PT. Adimas Puspita Serasi
Main
2009
  • Study of Coal Logistic by Railways
  • Basic Design of Handling Facilities
  • Estimate of Investment and Operation Costs
76
Tanjung Carat Coal Terminal Offshore Facilities Preliminary Design, South Sumatera
PT. Adani Global
Main

2008

  • Preliminary Design of Reclamation & Jetty
77

Jembayan Stockpile Facilities Design Review, East Kalimantan

PT. Indostraits
Main

2008–2009

  • Review Design of Stockpile and Berthing Facilities
78

Tanjung Priok Port Jetty Design at Eastern Breakwater, North Jakarta

PT. Pelabuhan Indonesia II

Main
2009
  • Design of Jetty, Reclamation and Container Yard
  • Feasibility Study for Port Development
79

Kertapati Coal Terminal Port Basic Design, South Sumatera

PT. Adimas Puspita Serasi
Main

2008

  • Basic Design of Coal Handling Facilities
  • Estimate of Investment & Operation Costs
80

Wood Transportation Jetty Design, South Sumatera

PT. SBA Wood Industries
Main

2008

  • Design of Jetty
81

PT. Pupuk Kaltim Service Jetty Design, Bontang – East Kalimantan

PT. Pupuk Kaltim, Bontang
Main

2008

  • Design of Jetty
82

Muara Karang Gas Power Plant Jetty Design, Jakarta

Mitsubishi Heavy Industry Ltd
Main

2008

  • Design of Jetty
83

LPG Refrigerated Receiving Terminal Jetty Preliminary Design, East Java

PT. Astratel Nusantara
Main

2008

  • Oceanographic and Bathymetric Surveys
  • Offshore Soil Investigation
  • Conceptual Design of Jetty
84

Kariangau Container Terminal Port Design, Balikpapan – East Kalimantan

PT. Pelabuhan Indonesia IV

Main

2008

  • Oceanographic, Bathymetric and Topographic Surveys
  • Soil Investigation
  • Design of Port
85

PT. Pertamina Main Transit Terminal Master Plan, Tuban – East Java

PT. Pertamina

Main

2008

  • Master Planning: Data Collection and Analysis; Economic and Financial Study
86
Belawan Port Master Plan, Medan – North Sumatera PT. Pelabuhan Indonesia I
Main

2007 - 2008

  • Master Planning
  • Oceanographic, Topographic and Bathymetric Survey
  • Satellite Imaging
87
Depapre Container Port, Phases II and III, Jayapura – Papua PT. Astratel Nusantara
Main

2007 - 2008

  • Data Collection and Analysis
  • Estimate of Investment and Operation Costs
88
Depapre Container Port, Phases II and III, Jayapura – Papua Depapre Container Port, Phases II and III, Jayapura – Papua PT Amitras Sarana Selaras Perkasa Consultant

2007 - 2008

  • Master Planning
  • Soil Investigation
  • Topographic Survey
  • Design of Port
  • Pre-Construction
89
Dumai Port Development Phase III

Directorate General of Sea Communication / JBIC LOAN IP-493

Pasific Consultant International - Indulexco

200–2008

  • Master Planning
  • Soil Investigation
  • Topographic Survey
  • Design of Port
  • Construction Supervision
90

Sugar and Coal Jetty Design, Serang – Banten

PT. Duta Sugar International

Main

2007

  • Oceanographic, Bathymetric and
  • Topographic Surveys
  • Soil Investigation
  • Design of Jetty
  • Pre-Construction
91
Coal Jetty Design, Cirebon – West Java PT. Astratel Nusantara
Main
2006
  • Soil Investigation and Analysis
  • Oceanographic and Topographic Surveys
  • Design of Jetty
92
Malahayati and Lhokseumawe Port Design, Aceh – Nanggroe Aceh Darussalam NAD-Nias Rehabilitation and Reconstruction Agency
Main

2006 - 2007

  • Soil Investigation and Geo-electrical Survey
  • Oceanographic and Topographic Surveys
  • Design of Port
93
Topographic and Bathymetric Surveys, Aceh – Nanggroe Aceh Darussalam

Sea Defense Consultants

Main

2006
  • Bathymetric and Topographic Surveys
94
2 x 600 MW Power Plant Jetty Design, Pemalang – Central Java

PT. Astratel Nusantara

Main

2006

  • Oceanographic, Bathymetric and Oceanographic Surveys
  • Soil Investigation
  • Design of Jetty
95
PT Pertamina Oil and Gas Port Master Plan, Balongan – West Java

PT. Pertamina

Main

2006

  • Soil Investigation
  • Master Planning
96
Sinabang Port Reconstruction , Aceh – Nanggroe Aceh Darussalam
UNDP
Witteveen+Bos

2006

  • Oceanographic, Bathymetric and Topographic Surveys
  • Soil Investigation
  • Master Planning
  • Design of Port
97
Calang Port Reconstruction Project, Aceh – Nanggroe Aceh Darussalam
UNDP

Witteveen+Bos

2006

  • Oceanographic, Bathymetric and Topographic Surveys
  • Soil Investigation
  • Master Planning
  • Design of Port
98
Tanker Mooring Facilities, Desa Sukra, Indramayu – West Java

PT. Bhakti Mingas Utama

Main

2006
  • Design of 3500 and 10.000 DWT Tanker Mooring Facilities
  • Permitting
99
Coal Handling Facilities Preliminary Design, Cirebon – Central Java
PT. Astratel Nusantara
Main
2006
  • Oceanographic Survey
  • Soil Investigation
  • Conceptual Design of Marine Facilities
100

Malahayati Port Rehabilitation, Aceh – Nanggroe Aceh Darussalam

Netherlands
ECORYS

2005-2006

  • Design of Port Rehabilitation
  • Construction Supervision
 
101

Palaran Port Master Plan and Design, Samarinda – East Kalimantan

BAPPEDA Samarinda / APBD

Main

2004-2005
Master Planning and Design of Port: Container, General Cargo, Passenger and Ferry Terminals
102

Oil Tanker Jetty, Sepanjang Island – East Java

EMP Kangean Limited
Main
2006
  • Design of 30.000 DWT Tanker Jetty
103
Cement Loading Jetty Design, Batam Island
PT. Bangun Cipta Kontraktor
Main

2005

  • Design of 40.000 DWT Bulk Carrier Jetty
104

Depapre Port Design, Jayapura – Papua

Communication Agency of Jayapura / APBD
PT Amitras Sarana Selaras Perkasa Consultant

2005

  • Soil Investigation
  • Topographic Survey
  • Design of Port
105
Semayang Terminal Design , Balikpapan – East Kalimantan
PT. Sugico Graha
Main
2005
  • Terminal Lay-out
106
Tanjung Priok Port Rehabilitation, Jakarta
JICA

Nippon Koei

2005
  • Soil Investigation
  • Oceanographic and Topographic Surveys
  • Design of Port and Breakwater

About Us

PT. Diagram Triproporsi Engineering Consultant was founded in 1980 with intensive projects portfolio in ports, harbors and urban drainage. Read more...

Contact Info

MAIN OFFICE :

+62 (021) 4701356
+62 (021) 4701357

E-mail : project@diagramtriproporsi.com
             ir.nani.setiawan@gmail.com

ADDRESS :

Agnesia Building 2nd floor, Jl. Pemuda 73B Jakarta Indonesia 13220

Location