The Last Ten Years Experiences
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Jetty II of PT. Pertamina RU II Assessment and Rehabilitation Engineering Design, Sungai Pakning – Riau | PT. Pertamina RU-II | Main | 2010 |
- Assessment & Engineering Design of Jetty II RU II - Assessment of Existing Jetty Condition Damaged by Ship - Design of Jetty Rehabilitation |
2 | Lhokseumawe Port Traffic Analysis, Nanggroe Aceh Darussalam | PT. Rekayasa Engineering | Main | 2010 |
- Ship Traffic Study - Pupuk Iskandar Muda Jetty and Facilities Extension Lay-out |
3 | Existing Jetty Pile Capacity Analysis at Amamapare Port, Timika – Papua | PT. Swi Jetty Nusantara | Main | 2010 |
- Pile Capacity Analysis - Remaining Service Life Study |
4 | Railway Track Soil Investigation, Tanjung Enim – South Sumatera | PT. Adani Global | Main | 2010 |
- 240 km Stretch Soil Sampling/Boring from Tanjung Enim to Tanjung Api Api - Soil Laboratory/Testing - Soil Sampling/Boring - Soil Laboratory/Testing - Dutch Cone Penetration Test |
5 | Offshore Handling Facilities and Jetty Preliminary Design, Tanjung Carat – South Sumatera | PT. Adani Sumsel | Main | 2010 |
- Cost Estimate and Preliminary Design of 200.000 DWT Coal Ship Jetty - Design of 10.000.000 m 3 Reclamation |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Detailed Engineering Design of PT Lestari Samudera Jetty, Balikpapan, East Kalimantan | PT Multi Pondasi Utama | Main | 2011 |
- Collecting data - Bathymetry survey - Tidal observation - Geotechnical analysis - Detailed engineering design of jetty and its facilities |
2 | Feasibility Study on Coal Transportation Development on Musi River, South Sumatera | Pelindo II | Sub consultant of Haskoning Indonesia | 2011 |
Examining further viability of development of coal transport facilities on the Musi River which includes: - Land/river transshipment elements - River transportation elements - Marine transshipment facility elements - Preparation of the input s for the AMDAL process |
3 | Bid Documents Evaluation for Jetty II of PT Pertamina (Persero) RU II Sei Pakning Rehabilitation Project, Riau Province | PT. Pertamina RU-II | Main | 2011 | Tender Assistance |
4 | Bathymetric Survey and Revetment Design for Marina M Walk Project, North Sulawesi | PT Tiga Karya Wenang | Main | 2011 |
- Bathymetric Survey - Revetment design |
5 | Provision of Matak Land Study, Riau Province | Premier Oil Natuna Sea B.V. | Witteveen+Boss Indonenesia | 2011 |
- Soil Investigation Works - Topographic Survey - Bathymetric Survey - Basic Design of Stockyard and Port Infrastructure - Cost Estimate |
6 | Feasibility Study of Container Ports Development at Pontianak, Palembang and Bengkulu | Pelindo II | Main | 2011 |
- Master Plan - Feasibility Study (Technical, Economical & Environmental) |
7 | Master Plan of LNG Floating Storage Regasifification Special Terminal for East Java – Central Java Unit in Tanjung Mas Port, Semarang, Central Java | PT Pertamina (Persero) – LKFT UGM & UNDIP | Sub consultant of LKFT UGM & UNDIP | 2011 |
- Site Visit - Master Plan |
8 | EPCM Consultant Services Procurement Two (2) Unit Hopper 750 Ton per Hour, Banten Province | PT Krakatau Bandar Samudera | Main | 2011 | - Engineering Design - Tender Assistance - Supervision Works |
9 | Conceptual Design of : Jetty, Trestle and On-Land Facilities, Madura Island | PT Adani Global | Main | 2011 | - Preliminary Design of Trestle and Mooring Dolphins - Preliminary Design of Service Road along Trestle - Preliminary Design of Coal Stockpiles Yard - Lay-out of Stacker Re-claimer to Blend Coal - Design Lay-out of Conveyor in Stockpile Yard - Design Lay-out of Conveyor from Stockpile Yard to Power Plant Processing Mill - Conceptual Coal Estimate |
10 | Phase I - Site Selection Project of Coal River Port in Malinau, East Kalimantan | PT Choice Plus Energy | Main | 2011 | - Data Collection - Site Visit - Bathymetri Survey - Conceptual Design |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Design Construction Works of Bridge Hopper, South Kalimantan | PT Waskita Karya Divisi V | Main | 2012 | Review of existing design |
2 | Geo-electric Survey on PT Mitra Niaga Mulia Area in Bunyu, East Kalimantan | PT Mitra Niaga Mulia | UPN Yoyakarta | 2012 | - Geo-electric Survey - Analysis of survey results |
3 | Geotechnical Study on Mining Activities of PT Lamindo Inter Multikon in Bunyu, East Kalimantan | PT Lamindo Inter Multikon | UPN Yoyakarta | 2012 | - Soil Investigation - Analysis of stability |
4 | Conceptual Design of 4 ( Four) Coal Terminals (PT . TDGP Coal Terminal, PT SRI Coal Terminal, PT KGB Coal Terminal, CV ABE Coal Terminal ) in Kalimantan | PT. Exploitasi Energi Indonesia, Tbk | Main | 2012 | - Conceptual design of 4 coal terminals - Cost Estimate Preparation |
5 | Survey Investigation Design of PT TDGP Coal Terminal PT TDGP in Tanah Laut, South Kalimantan | PT. Exploitasi Energi Indonesia, Tbk | Main | 2012 | - Topographic Survey - Bathymetric Survey - Soil Investigation - Laboratory Analysis - Coal Terminal Lay Out Preparation - Detailed Design of Coal Terminal |
6 | Pre-Review and Review / Re-Design of Reclamation | PT Pandega Citraniaga | Main | 2012 | - Design Revetment and Reclamation - Soil Improvement - Settlement Estimate - Cost Estimation & Bill of Quantity - Tender Assistance - Construction Supervision - Coordination Meetings - Design Revision |
7 | Review Design for Power House, MCC Room, Control Room, Pump House and Shear Connector of Tapin Coal Terminal Project, South Kalimantan | PT Waskita Karya | Main | 2012 | Review Design of Power House, MCC Room, Control Room, Pump House and Shear Connector |
8 | Design Of Reclamation at Green Bay, Pluit Jakarta | PT Kencana Unggul Sukses | Main | 2012 | - Detailed Engineering Design - Cost Estimate - Tender Document |
9 | Review Work of Hopper Bridge Pillars P20, P30, P34 and P38, South Kalimantan | PT Waskita Karya | Main | 2012 | - Review of Existing Design - Detailed Engineering Design |
10 | Unloading Calculation Works for 7 Days of Formwork, South Kalimantan | PT Waskita Karya | Main | 2012 | Unloading Design |
11 | Services Development Project of Greater Makassar Port, South Sulawesi Province | Port Authority of Region IV Office of Makassar | Main | 2012 | Review Of Port Master Plan |
12 | Survey, Investigation and Design of Wharf, at Lais River, Palemban, South Sumatra | PT Pelindo II, Palembang | Main | 2012 | - Topographic Survey - Bathymetric Survey - Soil Investigation - Laboratory analysis - Detailed Design - Cost Estimate - Tender Document |
13 | Review Design Structur Oprit Hopper Bridge and Jayo Bridge | PT Waskita Karya | Main | 2012 | Review Design |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Management Construction Of Jetty 5 in area TUKS PT Krakatau Steel, Tbk | PT Krakatau Bandar Samudera | Main | 2013 | - Construction Supervision - Coordination Meetings - Design Revision |
2 | Provide professional Consulting of common port/marine construction practices in support of the Port of Tanjung Priok Container Terminal Concession | Cardno TECH | Main | 2013 | Review Cost Estimate |
3 | Conceptual Design of The New Port at Bunyu Island, East Kalimantan | PT Adani Global | Main | 2013 | - Site Visit to the proposed port locations to review the natural and traffic conditions as well to perform roughly depth measurements - Data Collection which gathers maps, information from local Contractor and local material shops about labor,material and equipment unit price - Site Selection which is based on technical, and operational aspects - Conceptual design of the coal port which is consist of trestle and dolphin - Rough cost estimate of the trestle and dolphin - Rough layout of the material handling system using existing system location |
4 | Design jetty and trstle of Project power plant construction Parit Baru 2 x 50 Mw at Site Bengkayang | PT Praba Indopersada | Main | 2013-2014 | - Basic Design - Detailed Engineering Design |
5 | Review Design Structure Of Bridge Steel Frame at Bahau River | PT Waskita Karya | Main | 2013-2014 | Review Design |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Detailed Engineering Design of Pier and Slipway Dock, for Supply Base Terminal , at Pendingin, East Kalimantan | PT Elnusa, Tbk | Main | 2014 |   - Site Visit   - Detailed Engineering Design   - Cost Estimate   - Tender document |
2 | Design of Seaport Facility in Sangatta, East Kalimantan |   PT Waskita Karya | Main | 2014 |   Design Review |
3 | Design of Access Road to Marunda Terminal, Jakarta | PT Multikon Indrajaya Terminal | Main | 2014 |   Conceptual Design |
4 | Detailed Engineering Design of PipeRack Construction for Terminal Marunda Center Fase 1A , Jakarta | PT Pelabuhan Tegar Indonesia | Main | 2014 |   - Detailed Engineering Design   - Tender Evaluation   - Supervision |
5 | Design of Jetty for AKR, Nilam Utara, Tanjung Perak, Surabaya, East Java | PT SWI Jetty Nusantara | Main | 2014 |   - Site Survey   - Design Review |
5 | Detailed Engineering Design of Tanjung Priok Port Jetty, Jakarta | PT. Pelabuhan Indonesia II , Tanjung Priok | Main | 2014 |   - Topographic Survey   - Bathymetry and Tidal Survey   - Soil Investigation   - Detailed Engineering Design |
6 | Master Plan of Container Terminal at Depapre Port, Jayapura, Papua | Transportation Agency of Jayapura / APBD | Main | 2014 |   - Feasibility Study   - Port Master Plan |
7 | Design of Jetty and Infrastructure for Cluster NPK Chemicals, East Kalimantan | PT Pupuk Kaltim | KJJP Antonius Setiady & Rekan | 2014 |   - Basic Design   - Feasibility Study |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Detailed Engineering Design and Planning Layout Reclamation & gabion wall Kendari New Port Container Terminal | Pelindo IV | Main | 2015 |   - Detailed engineering design   - Planning layout reclamation & gabion wall |
2 | Construction Management of Jetty 7.3 and 4.5 - 4.6 | PT Krakatau Bandar Samudera | main | 2015 |   - Construction Supervision   - Construction management |
3 | Feasibility the coal traffic at Tanjung Api- Api | PT Indorama Synthetics, Tbk | Main | 2015 | Analyze the coal traffic including obstacles on the river and all cost from coal port to SEZ Tanjung Api-Api |
4 | Topography & Geotechnical Survey, Bojonegoro | PT Elnusa, Tbk | Main | 2015 |   - Topograpy survey   - Geotechnical survey |
5 | Master Plan of Muntok Port, Bangka Belitung Province | Port Authority Office Tanjung Priok | Main | 2015 |   - Feasibility Study   - Port Master Plan |
6 | Subbottom Profilling Survey of LNG Port, Cilegon, Banten | PT Energi Dian Kemala | Main | 2015 | Subbottom Profilling Survey |
7 | Study of Working Area (DLKr) and Interest Area (DLKP), Port of Sunda Kelapa, Jakarta | Port Authority Office Tanjung Priok | Main | 2015 | Site Survey and Investigation Preparation of Working Area and Interest Area |
8 | Survey, Investigation and Design of PT. CS2 Pola Sehat Jetty, Banyuasin Sungai Musi, South Sumatera | PT CS2 Pola Sehat | Main | 2015 |   - Bathymetry dan Oceanography Survey   - Soil Investigation   - Detailed Engineering Design   - Bill of Quantity, Cost Estimate dan Tender Document   - Supervision of Port Construction |
9 | Detailed Engineering Design of Coal Port Berthing Facility, Port of Bengkulu, Bengkulu | PT. Pelabuhan Indonesia II | Aurecon Indonesia | 2015 |   - Detailed Engineering Design   - Cost Estimate |
10 | Conceptual Design of Coal Port Jetty at Senegal, Afrika | PT. Synco Global | Main | 2015 |   - Conceptual Design   - Port Layout Selection |
11 | Design of Coal Port Jetty at Kelanis Selatan, East Kalimantan | PT. Adaro Indonesia | PT SWI Jetty Nusantara | 2015 |   - Port Design Review   - Jetty Design to increase Port Capacity from 8000 DWT to 18000 DWT vessels. |
12 | Design of Jetty and Trestle for Indonesia Power Plant Project at Cilegon, West Java | PT Tenaga Listrik Cilegon | PT Tosplant Engineering Indonesia |   - Basic Design of Jetty and Trestle   - Preparation of Technical Specification   - Preparation of Tender Document |
|
13 | Bathymetry and Hydro-oceanography Survey for Tarumanegara Port in Bekasi Utara, West Java | PT. Mega Agung Nusantara | Main | 2015 | Bathymetry and Hydro-Oceanography Survey |
14 | Design of Liquid Bulk Jetty, Bitung, North Sulawesi | PT. Aneka Kimia Raya Bitung | Main | 2015 | Jetty Repair Design |
15 | Impact study Link Way | PT Pelabuhan Tegar Indonesia | Main | 2015 |   - Design Review   - Design of Navigational Aids   - Preparation of Technical Specification   - Cost Estimate |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Design of Breasting Dolphin Capacity at Howe India | PT. Adani Global | Main | 2016 |   Review design of breasting dolphin capacity of pile diameter |
2 | Survey, Soil Investigation and Bathymetry at Muntok, Bangka Belitung Province | PT. Muntok Listrik Utama | Main | 2016 |   - Bathymetry and Oceanography Survey   - Soil Investigation |
3 | Detailed Engineering Design for Donggala Port at Central Sulawesi Province | Ministry of Transportation Republic of Indonesia | Main | 2016 |   - Detailed Engineering Design (Re-Design Jetty)   - Bill of Quantity, Cost Estimate and Tender Document |
4 | Construction Supervision | PT Krakatau Bandar Samudera | Main | 2016 |   Supervision of turning basin Dredging |
5 | Assesment & design review existing jetty, Lubuk Gaung, Dumai | PT. Ivomas Tunggal | Main | 2016 |   - Review design of jetty existing in Dumai   - Site Survey for assesment |
6 | Design of Jetty Existing at Bitung terminal – North Sulawesi Province | PT. AKR Corporindo, Tbk | Main | 2016 |   Review design of jetty existing |
7 | Master Plan of Depapre Port | Provincial Government of Papua Province – Jayapura District | Main | 2016 |   Review of port master plan -(Depapre port) |
8 | 8 Port Location Study at Indramayu, West Java Province | PT. Suryacipta Swadaya | Main | 2016 |   Supervision of port location - Survey of select location - Port layout design |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Construction Management for Dredging Jetty 4 & 7 port Basin, PT KBS Construction | PT Krakatau Bandar Samudera | Main | 2016 | Construction Management for Dredging Jetty 4 & 7 port Basin, PT KBS Construction |
2 | Construction Management for Jetty 7.3 and 4.5 - 4.6 Construction | PT Krakatau Bandar Samudera | Main | 2016 | Construction Management for Jetty 7.3 and 4.5 - 4.6 Construction |
3 | EXisting jetty Assesment, Bitung, North Sulawesi | PT. AKR | Main | 2016 | EXisting jetty Assesment, Bitung, North Sulawesi |
4 | Structure Check for Floating Restaurant in Muara Angke, DKI Jakarta | PT. Keppel Land | Main | 2017 | Structure Check for Floating Restaurant in Muara Angke, DKI Jakarta |
5 | Topografi dan Bathymetric Survey in Bidadari Island, North Jakarta | PT Jaya Ancol | Main | 2017 | Topografi dan Bathymetric Survey in Bidadari Island, North Jakarta |
6 | Survey dan Soil Investigation Bontang | PT GAMA | Main | 2017 | Survey dan Soil Investigation Bontang |
7 | Sea Toll Way study, Carno and ADB World Bank | Cardno Indonesia | Main | 2017 | Sea Toll Way study, Carno and ADB World Bank |
8 | Studi Alur Pelayaran Lematang, Boom Baru | PT. Titan Mining | Main | 2016 | Studi Alur Pelayaran Lematang, Boom Baru |
9 | Layout & Design Pontianak port | PT. golder Associates | Main | 2017 | Layout & Design Pontianak port |
10 | Assesment AKR Tower | PT. AKR | Main | 2017 | Assesment AKR Tower |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Soil Investigation Buntok, MuaraTeweh, Central Kalimantan | PT AKR CORPORINDO, Tbk | Main | 2018 | - Soil Investigation |
2 | Survey and Design Jetty AKR Buntok, Muara Teweh - Central Kalimantan | PT AKR CORPORINDO, Tbk | Main | 2018 | - Site Visit - Bathymetry Survey - Hydro-OceanographySurvey - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
3 | Rehabilitation Design and Elevation Disposition of Container Yard 216X – 218X, Port of Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 | - Topographic Survey - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
4 | Measurement of Parking Area Situations on Dufan Plaza, East Coast, And Carnival | PT Taman Impian Jaya Ancol | Main | 2018 | - Measurement Survey - Topographic Survey |
5 | Supervision of Construction Work on Container Yard 115 and Ex Warehouse 114 Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 | - Supervision |
6 | Topographic Survey, Buntok | PT AKR CORPORINDO, Tbk | Main | 2018 | - Topographic Survey |
7 | Survey, Investigation and Design Jetty AKR, Banyuasin, South Sumatra | PT AKR CORPORINDO, Tbk | Main | 2018 | - Site Visit - Soil Investigation - Hydro-OceanographySurvey - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
8 | Survey, Assessment and Review Design Jetty, West Nilam, Tanjung Perak, Surabaya | PT AKR CORPORINDO, Tbk | Main | 2018 | - Site Visit - Bathymetry Survey - Current Survey - Design Review 2 Exsisting Dolphin and caltivation - Trestle Protective Structure Design - Cost Estimation - Technical Specification - Tender Document |
9 | Layout & Bathymetry Survey, West Nilam | PT Terminal Nilam Utara | Main | 2018 | Layout & - Bathymetry Survey |
10 | Jetty Consultancy Service, Lubuk Gaung, Dumai | PT Sari Dumai Sejati /GLOBAL MARINE AND PORT SERVICES PTE LTD | Main | 2018 | - Site Visit - Collecting Data - Assessment - Recommendation |
11 | Improvement &Rehabilitation Design Container Yard Ex. Pacific Paint Phase II and Ex. Perca Warehouse at Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2018 | - Topographic Survey - Soil Investigation - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
12 | Survey, Investigation and Design Jetty, Bulukumba, South Sulawesi | PT Mitra Dagang Makmur | Main | 2018 | - Topographic Survey - Soil Investigation - Hydro oceanography Survey - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
13 | Jetty Design Validation on PT OKI Pulp & Paper Mills, Palembang | PT OKI Pulup & Paper Mills | Main | 2018 | - Review Design - Jetty Validation |
14 | Construction Supervision of Dredging at AKR West Nilam, Tanjung Perak, Surabaya | PT AKR CORPORINDO, Tbk | Main | 2018 | - Supervision of Dredging Work |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Conceptual Study of Anthracite Loading Terminal in Chimbote, Peru | Archean Andean Antharacite S, A | Main | 2019 | - Conceptual Layout Plan |
2 | Revitalitation Plan for Multipurpose Area Sindulang, West Side Inggom Jetty Plan and Jetty & Ex. Walie Jaya Yard Retrofitting in Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2019 | - Topographic Survey - Soil Investigation - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document |
3 | Cost Estimation on Saumlaki Terminal Getaway Asia | Arena Syscom | Main | 2019 | - Cost Estimation |
4 | Soil Investigationon North Side Lot A and B Ancol | KSO Jaya Ancol – Crown Group | Main | 2019 | - Soil Investigation offshore (5 boring location) |
5 | Lameruru Port Master Plan Study | Ministry of Transport | Main | 2019 | - Site Visit - Validation, analysis, and evaluation of data - Preparation Master Plan Lameruru |
6 | Lameruru Port Master Plan Study | Ministry of Transport | Main | 2019 | - Site Visit - Validation, analysis, and evaluation of data - Preparation Master Plan Lameruru |
7 | Soil Investigation of Floating Mosque Ancol | PT Taman Impian Jaya Ancol | Main | 2019 | - Soil Investigation offshore (4 boring location& 4 CPT location) |
No | Project | Owner | Main / AssociateYear | Year | Descriptions |
---|---|---|---|---|---|
1 | Design and Construction Supervision of 107 Selatan, 2019-223X, and Eks. Tjetot Container Yard in Tanjung Priok Port | PT Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok | Main | 2020 | - Topography Survey - Soil Investigation - Soil bearing capacity analysis and Settelment - Detailed Engineering Design - Cost Estimation - Technical Specification - Tender Document - Tender Assistant |
2 | Survey, Investigation and Design Jetty PT Sinarjaya Inti Mulya, Bandar Lampung | PT Sinarjaya Inti Mulya | Main | 2020 | - Site Visit - Soil Investigation - Bathymetry Survey - Cost Estimation - Technical Specification - Tender Document - Detailed Engineering Design |
3 | Design and Supervision Consultant (DSC) Emergency Assistance for Rehabilitation and Reconstruction (EARR) Port of Pantoloan,Donggala and Wani Central Sulawesi Province -Indonesia | Ministry Od Transportation, Directorate General of Sea Transportation, Directorate of Port Affairs | PT Aecon, OT Witteveen Bos Indonesia, PT Atrya Swacipta Rekayasa and PT Cita Prisma- JO | 2020 | - Phase 1:
Reconnaissance Survey, Feasibility Study (FS), Individual Port Masterplan (RIP) - Phase 2 : Prepare SPAR, and Safeguard Documents - Phase 3 : Detail Surveys, Preparation of Bidding Documents - Phase 4 : Procuretment Support - Phase 5 : Project Management and Construction Supervision |